My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9313 (2)
CWCB
>
UCREFRP
>
Public
>
9313 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:34 PM
Creation date
5/22/2009 7:23:32 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9313
Author
Burdick, B. D., J. Flair, M. Lloyd and B. Scheer.
Title
Native and Nonnative Fish Use of Two Gravel-Pit Ponds Connected to the Upper Colorado River at 29-5/8 Road Near Grand Junction, Colorado.
USFW Year
1997.
USFW - Doc Type
Project number CAP-6-GP,
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 <br />Tunnel is 3.8 miles long with a design capacity of 600 cfs, however, because <br />of structural problems the tunnels delivery capacity is restricted to 460 cfs. <br />With construction of Soldier Creek Dam, and enlarged Strawberry Reservoir, <br />storage facilities and most of the means of conveyance were incorporated into <br />the Strawberry Aqueduct and Collection System. Water stored in the enlarged <br />Strawberry Reservoir and owned by the Strawberry Valley Project is controlled <br />by the Strawberry Water Users Association and will be delivered through the <br />Syar Tunnel. <br />An average annual diversion of 61,500 acre-feet presently occurs through the <br />Syar Tunnel. A joint proposal for the right to develop hydroelectric power <br />was submitted by Central Utah Water Conservancy District and Strawberry Water <br />Users Association. In 1996 their proposal was accepted by the Department of <br />the Interior and they were granted the right to negotiate a lease of power <br />privilege within the Diamond Fork area in 1996. Consultation needs to be <br />completed on that Federal action. <br />The Central Utah Water Conservancy District operates and controls annual <br />operations of project facilities under contract with the Bureau of <br />Reclamation; thus, depletions associated therewith are subject to section 7 <br />consultation. <br />Provo River Pro.iect: Duchesne Tunnel <br />The Provo River Project provides a supplemental water supply for irrigation <br />and for communities along the Wasatch Front, Bonneville Basin. Part of the <br />water supply is supplied by the Duchesne River. Features of the collection <br />system involving the Duchesne River include the Duchesne Diversion Dam and the <br />Duchesne Tunnel. The Duchesne Diversion Dam is on the North Fork of the <br />Duchesne River. The Duchesne Tunnel conveys water from the diversion dam to <br />the Provo River drainage basin. The tunnel is 6 miles long and has a capacity <br />of 600 cfs. Construction and lining of the Duchesne Tunnel were completed in <br />1952. Effects of this project are addressed both in this opinion and in the <br />Provo River operations opinion. <br />At full demand, an average annual depletion of 31,700 AF will occur through <br />the Duchesne Tunnel. Operation of the Provo River Project, of which the <br />Duchesne Tunnel is a feature, requires contractual authorization by the Bureau <br />of Reclamation and is therefore subject to section 7 consultation. <br />Central Utah Project - Bonneville Unit <br />
The URL can be used to link to this page
Your browser does not support the video tag.