Laserfiche WebLink
• CONTENTS (.Continued) <br />Economies <br /> Page <br />Introduction. 1 <br />Prod ect costs , , 1 <br />Construction cost. 1 <br />Interest duffing construction 1 <br />Operation, maintenance, and replacement cost... 3 <br />Prod ect alternatives . 3 <br />Economic analysis 7 <br />Cost effectiveness 7 <br />Plan selection .. 4 <br />Benefits . 9 <br />Financial analysis. 10 <br />Cost allocation. 10 <br />Repayment . , 10 <br />TABLE S <br /> Hydrosalinity <br />• Number Page <br /> 1 Summary of Government Highline Canal diversions for <br /> irrigation . 1. <br /> 2 Average monthly flows, Colorado River near Cameo,, <br /> Colo. 5 <br /> 3 Average monthly flows, Gunnison River near Grand <br /> Junction, Colo. 7 <br /> 4 Average monthly flows, Plateau Creek near Cameo, <br /> Colo. 8 <br /> 5 Water quality data. 10 <br /> 6 Abstract of Grand Valley water rights, Colorado <br /> River 12 <br /> 7 Abstract of Grand Valley water rights, Gunnison <br /> River 15 <br /> 8 Irrigation diversions in Grand Valley . 16 <br /> 9 Water utilization 18 <br /> 10 Seepage rates of Grand Valley canals. 20 <br /> 11 Seepage rates of laterals below Government Highline <br /> Canal 21 <br /> 12 Canal and lateral seepage 26 <br /> 13 Summary of water intake rates 27 <br /> 14 Crop distribution in Grand Valley 29 <br /> 15 Tailwater runoff in Grand Valley. 30 <br /> 16 Cropping patterns in percent for systems' design in <br /> Grand Valley. <br />. <br />• 32 <br />• 17 W ash study area. <br />tests, Reed <br />Summary of aquifer 46 <br />iv <br />