My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7420
CWCB
>
UCREFRP
>
Public
>
7420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/22/2009 7:13:30 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7420
Author
U.S. Bureau of Reclamation.
Title
Colorado River Basin Salinity Control Project, Stage One Development, Grand Valley Unit Definite Plan Report.
USFW Year
1978.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• CONTENTS (Continued) <br /> Hydrosalinity (Continued) <br /> Page <br /> Chapter IV G round water geohydrology (continued) <br /> Aquifer characteristics (continued) <br /> Ground water observation system. 38 <br /> Gradients . 41 <br /> Transmissivity and permeability. 41 <br /> Storage . 47 <br /> Ground water quality 47 <br /> Chapter V S alinity mechanisms. . 55 <br /> Water and salt mechanisms in the Reed Wash <br /> study area. 55 <br /> Outflow hydrology . 58 <br /> Water and salt budgets . 66 <br /> Selected bibliography 76 <br /> Attachments <br /> Attachment 1 Stiff diagram-base flow conditions--Colorado <br /> River at Cameo . 78 <br /> Attachment 2 Stiff diagram-base flow conditions--Plateau <br /> Creek at sampling station GV-6. 79 <br /> Attachment 3 Stiff diagram-base flow conditions--Gunnison <br /> River at sampling station GV-140.5. 80 <br /> Attachment 4 -Colorado <br />Stiff diagram-base flow conditions <br />• • • <br />, <br />River at State line <br />81 <br /> Attachment 5 Grand Valley Unit seepage from canals 82 <br /> Attachment 6 Schematic cross-section of AP wells along <br /> Q Road, Section A-A'. <br />• 83 <br /> Attachment 7 AP wells along <br />Schematic cross-section of <br /> 0~ Road, Section B-B' . 84 <br /> Attachment 8 Schematic cross-section of AP wells along <br /> 14 Road, Section C-C' 85 <br /> Attachment 9 Geologic log of drill Hole AP-Z 86 <br /> Attachment 10 Geologic log of drill Hole AP-11. . 87 <br /> Attachment 11 Geologic log of drill Hole AP-22. 88 <br /> Attachment 12 Total dissolved solids, irrigation season, <br /> Reed Wash study area. 89 <br /> Attachment 13 TDS difference between nonirrigation and <br /> irrigation seasons . . 90 <br /> Attachment 14 Salt load comparisons between 1974-75 and <br /> 1975 seepage runs 91 <br /> Attachment 15 Comparison of flows, 1975-76 seepage run. 92 <br /> Attachment 16 Comparison of total dissolved solids, 1975-76 <br /> seepage run 93 <br /> Attachment 17 Comparison of salt load, 1975-76 seepage run. 94 <br /> Attachment 18 Column explanations for the water budget. 95-97 <br /> Attachment 18 Reed Wash study area water budget values, <br /> preproject budget 1976. . 98 <br /> Attachment 19 values, <br />Reed Wash study area salt budget <br />• . <br />• <br />preproject budget 1976. <br />99 <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.