Laserfiche WebLink
the Upper Basin states can be made, <br />Development of the long list of part- <br />icipating projects can proceed without <br />endangering the rights of the Lower <br />Basin to its share of water under the <br />Colorado River Compact of 1922. <br />Without the Storage Units and the <br />carryover or holdover storage they will <br />rapture in wet years, Upper Basin pros- <br />pects would riot be feasible. In dry <br />years they could not divert water to <br />deplete the Coloradc~ River to less than <br />the flows assured to the Lower Basin <br />ualder.-. t~ Compact.. In past years of <br />record, the Colorado flows which average <br />13 million acre-feet at Lees Ferry have <br />been as low as ~ million acre-feet. <br />Sowever, with the CRSP Storage Units, <br />adequate water for the Upper Basin <br />will ~ be available whether the <br />year is wet or dry. <br />The CRSP Storage Units have great <br />significance for another reason. <br />Irrigation farmers have long been short <br />of water=have long needed supplemental <br />water and storage dams on the tributaries <br />of the Colorado from which they irrigate <br />their farms. <br />Now, with the CRSP Storage Units, <br />Upper Basin farmers have a paying Partner <br />to assist them in meeting the require- <br />ments to repay reimbursable coast in <br />full. Powerplants at Glen Canyon Dam, <br />Flaming Gorge Dam, and Curecanti Unit <br />dams, along with some smaller plants <br />on participating projects, will produce <br />marketable power. Surplus revenues from <br />the sale of the power will go into-the <br />Upper Colorado River Basin Fund to <br />assist in the repayment of the partici- <br />pating project costs. The farmers will <br />repay to the mazimum of their ability <br />to do so, and the b~J.ance will be repaid <br />by power revenues accruing to the Basin <br />Fend. Colorado River System water, <br />which is regulated bo meet compact requi- <br />rements, also will be used to produce <br />hydro electric power a.s the water is <br />released through the CRSP powerplants. <br />GLEN CANYON DAM NEARS COMPLETION <br />Glen Canyon Dam, the largest and most <br />important of the Storage Unit dams, will <br />be topped out this month. Power from the <br />first of the eight 112,500-kilowatt gener- <br />ators is scheduled to go on the line is <br />June 1964. The remains-ng generators are <br />to go on the line at about foar-month <br />intervalswith the last generator scheduled <br />for July 1966. <br />Storage of water in Lake P®well began. <br />on March 13. By the end of the year,. one <br />of the driest on record, it is expected <br />that Lake Powell will be 120 miles long <br />and contain approzimately 3 mi]-lion acre-_. ~- <br />feet of water. <br />FLAMING GORGE POWER <br />Water storage began at Flaming Gorge <br />Reservoir on N vemberl, 1962, and the dam <br />was topped out~November 15. It is the <br />first dam to be built on the Green River. <br />The first of the three 36,000-kilowatt <br />generating units will be ready to go on <br />the line in October of this year with <br />the last generator to go into operation <br />in March 1964, as now scheduled. <br />NAVAJO DAM DIDICATED <br />ATavajo Dam was completed, essentially, <br />and dedicated in a ceremon3r held at the <br />damsite in September 1962. Although there <br />will. not..be a powerplant at the Navajo <br />Dam, it has very important functions in <br />addition to regulation of the flows of the <br />San Juan River. It will make possible the <br />gravity diversion of water directly from <br />the reservoir to the 110,000-acre Navajo <br />Indian Irrigation Project, and from an <br />upstream point to the San Juan-Chama Pro--- <br />ject, which will take supplemental irri- <br />gation water and municipal and industrial <br />water from the San Juan River into the <br />Rio Grande drainage. Municipal and indus- <br />trial: water supplies ar urgently needed <br />i:n this vicinity which includes Albuquerque <br />New Mexico. Both of the latter projects <br />are authorized and preconstruction surveys <br />are in progress. , <br />-~3 - - <br />