Laserfiche WebLink
8. <br />1. <br />• <br />2. <br />3. <br />• <br />• <br />PROPOSAL FOR PHASING GURU II SSUES. <br />Can be addressed now, and sho ld be done first. <br />a• Compact Entitlement. <br />b- Initial Water Availabili for 15-Mile Reach. <br />c. Standards for Quantifyin Flow Needs. <br />Need to be preceded by other rk, but should be done as <br />soon as that work is done. <br />a• Juniper-Cross Mountain T nsaction: After development <br />of model for study on al rnative reservoirs. <br />b• Water Salvage for 15-Mil After completion of CWCB <br />study on water salvage. <br />Can be addressed now, but sho d be deferred to second <br />phase. <br />a. Storage Releases. <br />b. Subsequent Water Availabi ity Analysis for 15-Mile <br />Reach. <br />Offered by Robert Wigington <br />10-24-91 <br /> <br />s0~se•d ST1~9986 <br />4 <br />Ol AJNdf1~13SN0~ ~Nn i t+N ~.,~n~-+ , c .aT T~ -T ~~ , ~~ <br />