My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7732
CWCB
>
UCREFRP
>
Public
>
7732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/22/2009 7:08:37 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7732
Author
Center for Public-Private Sector Cooperation, U. o. C.
Title
Recommendations on the Legal, Policy, and Institutional Issues Related to Instream Flow Protection in Colorado.
USFW Year
1993.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. CONCLUSIONS AND RECOMMENDATIONS <br />• <br />4.l Conclusions. <br />In reviewing the deliberations and progress of GURU iI, it might be useful to evaluate the <br />process and the outcomes in terms of those factors that seemed to work in favor of a positive <br />outcome and those that militated against. <br />4.2. Factors That Made Progress Difficult <br />4.2.1.' Technical and Legal Complexity. It was obvious at the outset of this <br />endeavor that many forces were at play that would render progress towazd a wise outcome <br />supported by a strong consensus quite difficult. The GURU II issues are technically and legally <br />v~ complex and time consuming, and may ultimately require resolution by policy makers and <br />managers. <br />• Colorado water law, based upon the doctrine of prior appropriation, and interpreted richly <br />through one hundred yeazs of case law, is highly specialized. The fundamental legal complexity <br />was further compounded by the fact that, as regazds the possible appropriation of interim instream <br />flows for endangered fish species, GURU II was blazing new territory and speculating on the <br />establishment of new legal precedent. <br />4.2.2.- Technical Uncertainties/Methodology Problem. In addition to the legal <br />complexities, GURU II had to grapple with highly technical biological and engineering issues. <br />This set up one of the enduring difficulties of the GURU II project and that was what some <br />perceived as a clash between the engineering and. the biological disciplines. This clash became <br />most evident, and most contentious, as regards the basis upon which instream flow protection <br />might be granted by the Colorado Water Conservation Board. Some biologists have asserted that <br />empirical biological data and their professional judgements about it may be the "best science", <br />• 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.