Laserfiche WebLink
• • • <br />Table 3.4.2.1. PRIORITY STRATEGIES FOR WATER ACQUISITION <br />River Season Time Frame <br />YAMPA Winter <br />Spring <br />Summer/Fall <br />(* = Do first. o = Do next.) <br />Interim (0-5 yrs.) <br />Strategy <br />---------------------------------------------- <br />o Appropriate a new absolute junior water right <br />(3.4.1.1.) <br />o Acquire an existing conditional water right (3.4.1.5.) <br />Longterm (5+ yrs.) o Acquire an existing conditional water right (3.4.1.5.) <br />o Appropriate a new absolute junior water nght <br />(3.4.1.1.) <br />Interim (0-5 yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br />o Appropriate a new absolute junior water rght <br /> (3.4.1.1.) <br />Longterm (5+ yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br />o Appropriate a new absolute junior water nght <br /> (3.4.1.1.) <br />Interim (d-5 yrs.) o Appropriate a new absolute junior water right <br /> (3.4.1.1.) <br />* Acquire an existing conditional water right (3.4.1.5.) <br />* Acquire existing non-federal reservoir storage rights <br /> (3.4.1.6.) <br />Longterm (5+ yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br />* Acquire existing non-federal reservoir storage rights <br /> (3.4.1.6.) <br />3-13 <br />