Laserfiche WebLink
• Table 1a. Comparison of Scour and Deposition for the Bonanza Bridge River Cross Sections June 1996 <br />to June 1997 <br />Cross Section Range of Scour (-) & Deposition (+) in feet Comments <br /> Left 1/3 of <br />channel Center 1/3 <br />of channel Right 1/3 <br />of <br />channel Average <br />Change <br />BB-1 -6 to 0 0 to +0.5 -3 to 0 -2 Thalweg scoured deeper and <br />narrowed 3 ` <br />BB-2 0 to 2 -2 to +2 -0.5 to 0 +0.5 Minor deposition and bar shifting <br />BB-3 0 to 3 -2 to +2 -1 to 0 +0.5 Minor deposition and bar shifting <br />BB-4 -1.5 to 0 -3 to 0 +0.5 to 4 0 Bar shifting <br />Table 1 b. Comparison of Scour and Deposition for the Bonanza Bridge River Cross Section June 1997 to <br />June 1998 <br />Cross Section Range of Scour (-) and Deposition (+) in feet Comments <br /> Left 1/3 <br />of channel Center <br />1/3~d of <br />channel Right 1/3 <br />of channel Average <br />Change <br />BB-1 0 to 1 -1.5 to 0 -0 To 2 0 Bar shifting, widening of thalweg. <br />BB-2 -2.5 to 0 -2.5 to 0 -1 to 0 -1 Bar shifting, minor scour <br />BB-3 -2 to +1 0.5 to 5 -2.5 to -1 0 Bar shifting, no overall change <br />BB-4 0 to 2 -2 to +3 -2 to 0 0 Bar shifting, no overall change <br />Table 1c. Comparison of Scour and Deposition for the Bonanza Bridge Bottomland Cross Sections June <br />1996 to May 1997 <br />• <br />Cross Section Range of Scour (-) & Depositi on (+) in feet Comments <br /> Left 1/3 of <br />channel Center 1/3 <br />of channel Right 1/3 <br />of <br />channel Average <br />Change <br />BB-5B 0 to 0.25 0 0 to 0.25 0 Some minor deposition <br />BB-6B 0 0 0 0 No changes <br />BB-76 0 0 0 0 No changes <br />BB-86 <br />-- 0 0 0 0 April 1997 data is not accurate within <br /> <br />0.25' <br />Table 1 d. Comparison of Scour and Deposition for the Bonanza Bridge Bottomland Cross Sections May <br />1997 to June 1998 <br />Cross Section Range of Scour (-) & Deposition (+) in feet Comments <br /> Left 1/3 of <br />channel Center 1/3 <br />of channel Right 1/3 <br />of <br />channel Average <br />Change <br />BB-5B -0.25 to 0 0 to 0.5 -0.25 to 0 +0.25 Deposition in middle, scour along <br />sides <br />BB-66 0 0 to 0.25 0 0 Minor deposition <br />BB-7B 0 0 0 0 No change <br />BB-86 0 0 0 0 No change <br />3-5 <br />