•
<br />Table of Contents, Continued
<br />List of Photos
<br />1 Bonanza Bridge site As Built, April 1997 3-7
<br />2 Bonanza Bridge site with floodplain connection Green River at 22,000 cfs, May 1997 3-7
<br />3 Bonanza Bridge Post-Runoff 1997 3-8
<br />4 Bonanza Bridge Post-Runoff 1998 3-8
<br />5 Spoils pile without vegetation, May 1997 3-9
<br />6 Spoils pile with some vegetation, August 1997 3-9
<br />7 Bonanza Bridge site prior to construction, February 1997 3-10
<br />8 Bonanza Bridge site sand bar Post-Runoff, August 1997 3-10
<br />9 Horseshoe Bend site connected to river at 14,000 cfs, May 1998 3-15
<br />10 From lower end of Horseshoe Bend levee removal looking upstream, May 1998 3-15
<br />11 From lower end of Horseshoe Bend levee removal looking upstream, June 1998 3-16
<br />12 Mouth of Stirrup River inlet/outlet channel as-built 3-22
<br />13 Mouth of Stirrup River inlet at 21,000 cfs, May 1998 3-22
<br />14 Centerline of Stirrup River channel looking upstream towards bottomland, April 1997 3-23
<br />15 Centerline of Stirrup River channel looking upstream towards bottomland, August 1997 3-23
<br />16 Centerline of Stirrup River channel looking upstream towards bottomland, June 1998 3-24
<br />17 From river looking at scour channel that developed at mouth of inlet 3-24
<br />18 Baeser Bend inlet at mouth. Green River at 14,000 cfs May 1998 3-29
<br />19 Baeser Bend inlet scour channel developed during 1998 run-off season, May 1998 3-29
<br />20 Above Brennan outlet at 14,000 cfs, May 1998 3-23
<br />21 Above Brennan outlet looking towards Bottomland. Green River at 14,000 cfs, May 1998 3-33
<br />22 Johnson Bottom Levee Removal flooding at 14,000 cfs looking downstream along cut, 5/98 3-38
<br />23 Johnson Bottom Levee Removal flooding at 14,000 cfs looking upstream along cut, 5/98 3-38
<br />24 Leota 7a downstream cut as built looking downstream along levee removal, March 1998 3-44
<br />25 LEB-7 Mon. looking upstream along cut starting to flood at 14,000 cfs, May 1998 3-44
<br />26 Leota-7a outlet outflowing after runoff season, June 1998 3-45
<br />27 Centerline of Leota-7a outlet channel looking towards river, November 1998 3-45
<br />28 Newly-armored Leota-7 outlet channe! and adjacent river sandbar, November 1998 3-46
<br />29 Concrete pad provides vehicle access across constructed outlet channel, 11/98 3-46
<br />30 Old Charlie Diked as-built looking upstream along cut, April 1997 3-52
<br />31 Old Charlie Diked flooding at 17,000 cfs looking upstream along cut, May 1997 3-52
<br />32 Old Charlie Diked Post-Runoff 1997 looking upstream along cut, August 1997 3-53
<br />33 Old Charlie Diked scoured outlet channel looking toward bottomland, June 1998 3-53
<br />List of Appendices
<br />APPENDIX A Cross Section Plots A-1
<br />APPENDIX B.1 Peer Review Comments 6.1-1
<br />APPENDIX 6.2 Responses to Peer Review Comments B.2-1
<br />List of Key Words
<br />flooded bottomlands, floodplain, river hydrology, river hydraulics, endangered species, frequency, flow
<br />duration, overbank flooding, riparian zone, pea4 flows, bankfull discharge;- Green River, Upper Colorado
<br />River Basin
<br />• vi
<br />
|