Laserfiche WebLink
• <br />Table of Contents, Continued <br />List of Photos <br />1 Bonanza Bridge site As Built, April 1997 3-7 <br />2 Bonanza Bridge site with floodplain connection Green River at 22,000 cfs, May 1997 3-7 <br />3 Bonanza Bridge Post-Runoff 1997 3-8 <br />4 Bonanza Bridge Post-Runoff 1998 3-8 <br />5 Spoils pile without vegetation, May 1997 3-9 <br />6 Spoils pile with some vegetation, August 1997 3-9 <br />7 Bonanza Bridge site prior to construction, February 1997 3-10 <br />8 Bonanza Bridge site sand bar Post-Runoff, August 1997 3-10 <br />9 Horseshoe Bend site connected to river at 14,000 cfs, May 1998 3-15 <br />10 From lower end of Horseshoe Bend levee removal looking upstream, May 1998 3-15 <br />11 From lower end of Horseshoe Bend levee removal looking upstream, June 1998 3-16 <br />12 Mouth of Stirrup River inlet/outlet channel as-built 3-22 <br />13 Mouth of Stirrup River inlet at 21,000 cfs, May 1998 3-22 <br />14 Centerline of Stirrup River channel looking upstream towards bottomland, April 1997 3-23 <br />15 Centerline of Stirrup River channel looking upstream towards bottomland, August 1997 3-23 <br />16 Centerline of Stirrup River channel looking upstream towards bottomland, June 1998 3-24 <br />17 From river looking at scour channel that developed at mouth of inlet 3-24 <br />18 Baeser Bend inlet at mouth. Green River at 14,000 cfs May 1998 3-29 <br />19 Baeser Bend inlet scour channel developed during 1998 run-off season, May 1998 3-29 <br />20 Above Brennan outlet at 14,000 cfs, May 1998 3-23 <br />21 Above Brennan outlet looking towards Bottomland. Green River at 14,000 cfs, May 1998 3-33 <br />22 Johnson Bottom Levee Removal flooding at 14,000 cfs looking downstream along cut, 5/98 3-38 <br />23 Johnson Bottom Levee Removal flooding at 14,000 cfs looking upstream along cut, 5/98 3-38 <br />24 Leota 7a downstream cut as built looking downstream along levee removal, March 1998 3-44 <br />25 LEB-7 Mon. looking upstream along cut starting to flood at 14,000 cfs, May 1998 3-44 <br />26 Leota-7a outlet outflowing after runoff season, June 1998 3-45 <br />27 Centerline of Leota-7a outlet channel looking towards river, November 1998 3-45 <br />28 Newly-armored Leota-7 outlet channe! and adjacent river sandbar, November 1998 3-46 <br />29 Concrete pad provides vehicle access across constructed outlet channel, 11/98 3-46 <br />30 Old Charlie Diked as-built looking upstream along cut, April 1997 3-52 <br />31 Old Charlie Diked flooding at 17,000 cfs looking upstream along cut, May 1997 3-52 <br />32 Old Charlie Diked Post-Runoff 1997 looking upstream along cut, August 1997 3-53 <br />33 Old Charlie Diked scoured outlet channel looking toward bottomland, June 1998 3-53 <br />List of Appendices <br />APPENDIX A Cross Section Plots A-1 <br />APPENDIX B.1 Peer Review Comments 6.1-1 <br />APPENDIX 6.2 Responses to Peer Review Comments B.2-1 <br />List of Key Words <br />flooded bottomlands, floodplain, river hydrology, river hydraulics, endangered species, frequency, flow <br />duration, overbank flooding, riparian zone, pea4 flows, bankfull discharge;- Green River, Upper Colorado <br />River Basin <br />• vi <br />