Laserfiche WebLink
REDLANDS DAM. <br />FISHWAY FEASIBILITY STUDY <br />TABLE OF CONTENTS. <br />Executive Summary <br />Paragraph Page <br />I. Purpose and Authorization 1 <br /> A, Purpose 1 <br /> B. Authorization 1 <br />II, Site Description and Background Information 1 <br /> A. Description of Redlands Diversion Dam 1 <br /> B. Present Operation of Diversion Dam 1 <br /> C. Endangered Species Background 2 <br />III. Functional Criteria 4 <br /> A. Biological Considerations and Recommended Criteria 4 <br /> B. Technical Considerations and Recommended Criteria 5 <br />IV. Preliminary Alternatives 5 <br /> A. Background Information 6 <br /> B. General Description of Preliminary Alternatives 7 <br /> C. Selection of Final Alternatives 9 <br />V. Study of Final Alternatives 10 <br /> A. Background Information 10 <br /> B, Alternate No. 1 10 <br /> C. Alternate No. lA 16 <br /> D. Alternate No. 2 22 <br /> E. Alternate No. 3 26 <br /> F. Alternate No. 4 31 <br />VI. Recommendations 35 <br /> A. Summary of Alternates 35 <br /> B. Conclusions 36 <br />VII. Design and Construction Schedule for Recommended Alternate 37 <br /> <br />i <br />