Laserfiche WebLink
<br />TABLE 4 <br />FEASIBILITY COST ESTIMATE <br />ALTERNATE N0. 2 <br />Item <br />Prep Work <br />Winter Protection <br />Dewatering <br />Access Roads <br />Mob and Demob <br />Structural <br />Concrete w/Reinforcing <br />Diffuser Grating <br />Miscellaneous Metal <br />Concrete Removal <br />Rock Removal - Stones <br />Earth Excavation <br />Structural Steel (Bar Screen) <br />Mechanical <br />18" Waterman C-20 Sluice Gate <br />24" Waterman C-20 Sluice Gate <br />24" Butterfly Valve <br />Hand Crane for Lifting Fish <br />(3" Tubing w/2~" Round Post) <br />18" CCP w/Welded Joints <br />24" CCP w/Welded Joints <br />Plus Elbows <br />Slide Gates <br />Unit Quantit Unit Priee Amount <br />LS 1 $10,000.00 $ 10,000 <br />JOB 1 20,000.00 20,000 <br />JOB 1 2,000.00 2,000 <br />JOB 1 50,000.00 50,000 <br />CY 99 600.00 59,400 <br />LB 940 1.50 1,410 <br />LB 92 2.50 230 <br />CY 61 1,100.00 73,700 <br />CY 12 35.00 420 <br />CY 39 16.00 624 <br />LB 3,080 2.50 7,700 <br />EA 2 4,800.00 9,600 <br />EA 1 5,050.00 5,050 <br />EA 1 9,000.00 9,000 <br />EA 1 2,500.00 2,500 <br />LF 12 350.00 4,200 <br />LF 30 200.00 6,000 <br />EA 2 2,100.00 4,200 <br />EA 1 7,500.00 7,500 <br /> Subtotal $273,534 <br /> Contingencies 25% 68,384 <br /> Subtotal $341,918 <br /> E&D, S&A 20% 68,384 <br />TOTAL $410,302 <br />Use $410,300 <br /> <br />TABLE 4 <br />