Laserfiche WebLink
complications with the reduced spillway capacity associated with Alternate <br />No. lA, then the higher cost Alternate No. 1 should be reconsidered. <br />L~ <br />VII. DESIGN AND CONSTRUCTION SCHEDULE FOR RECOMMENDED ALTERNATE. <br />Start Design <br />Complete Plans and Specifications <br />(Advertise Contract) <br />Notice to Proceed <br />Construction Complete <br />1 January 1987 <br />1 June 1987 <br />1 September 1987 <br />1 April 1988 <br />37 <br />