Laserfiche WebLink
River Season Time Frame Strategy <br />COLORADO - Summer/Fall Interim (0-5 yrs.) * Appropriate a new absolute and conditional junior water <br />15-mi. reach & and right (3.4.1.3.) <br />above (continued) Longterm (S+ yrs.) * Modify federal reservoir management practices <br />(3.4.1.7.) <br />o Acquire salvaged water from consumptive use projects <br />(3.4.1.8.) <br />o Acquire an existing conditional water right (3.4.1.5.) <br />o Acquire an existing absolute water right (3.4.1.4.) <br />o Acquire existing non-federal reservoir storage rights <br />(3.4.1.6.) <br />------------------------------------------------------------------------------------------- <br />COLORADO Winter Interim (0-5 yrs.) o Appropriate a new absolute and conditional junior water <br />(below 15-mile nght (3.4.1.3.) <br />reach to state line) <br />Longterm (5+ yrs.) o Acquire an existing conditional water right (3.4.1.5.) <br />Spring Interim (0-5 yrs.) o Appropriate a new absolute and conditional junior water <br />and right (3.4.1.3.) <br />Longtern (5+ yrs.) o Acquire an existing conditional water right (3.4.1.5.) <br />o Modify federal reservoir management practices <br />(3.4.1.7.) <br />Summer/Fall Interim (0-5 yrs.) o Appropriate a new absolute and conditional junior water <br />and right (3.4.1.3.) <br />Longterm (5+ yrs.) o Acquire an existing conditional water right (3.4.1.5.) <br />o Modify federal reservoir management practices <br />(3.4.1.7.) <br />o Acquire salvaged water from consumptive use projects. <br />(3.4.1.8.) <br />(* = Do first. o = Do next.) <br />3-15 <br />