Laserfiche WebLink
Table 3.4.2.1. PRIORITY STRATEGIES FOR WATER ACQUISITION <br />River Season Time Frame Strategy <br />------------------------------------------------------------------------------------------- <br />YAMPA Winter Interim (0-5 yrs.) o Appropriate a new absolute junior water right <br />(3.4.1.1.) <br />o Acquire an existing conditional water right (3.4.1.5.) <br />Longterm (5+ yrs.) o Acquire an existing conditional water right (3.4.1.5.) <br />o Appropriate a new absolute jutior water nght <br />(3.4.1.1.) <br />Spring Interim (0-5 yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br /> o Appropriate a new absolute junior water right <br /> (3.4.1.1.) <br />Lon~tenn (5+ yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br /> o Appropriate a new absolute junior water nght <br /> (3.4.1.1.) <br />Summer/Fall Interim (0-5 yrs.) o Appropriate a new absolute junior water right <br /> (3.4.1.1.) <br /> * Acquire an existing conditional water right (3.4.1.5.) <br /> * Acquire existing non-federal reservoir storage rights <br /> (3.4.1.6.) <br />Longtenn (5+ yrs.) * Acquire an existing conditional water right (3.4.1.5.) <br /> * Acquire existing non-federal reservoir storage rights <br /> (3.4.1.6.) <br />(* = Do first. o = Do next.) <br />3-13 <br />