The Controversial Effects of Instream <br />Flow Determinations <br />W. B. Smith, P.E. <br />Past President of the National Hydropower Association, and <br />Senior Vice President of Hydropower <br />Benham-Holway Power Group <br />Tulsa, Oklahoma <br />The controversy over instream uses of water has become a major issue in the bal- <br />ancing of power production and environmental preservation as defined in the <br />Electric Consumers Protection Act (ECPA). The effects of minimum instream flow re- <br />quirements can impact a hydropower facility by reducing potential power production, <br />increasing costs associated with the operational recordkeeping, and increasing costs for <br />studies required to determine the effects of minimum flows in preparation for filing an <br />application for a new Federal Energy Regulatory Commission (FERC) license. The pri- <br />mary environmental areas where minimum flow determinations are addressed in FERC <br />licenses include wetlands, waterfowl management, habitat loss, and recreational use of <br />water. These intensely focused environmental issues that must be addressed are dis- <br />couraging hydropower developers during the initial licensing process. Balancing energy <br />needs and environmental concerns necessitates a seemingly endless review by appli- <br />cants for new licenses (relicensing) when deciding the feasibility of continuing the <br />operation of existing low-cost hydropower facilities. The increasing costs of environ- <br />mental mitigation and enhancement are rapidly creating a negative impact on the future <br />development of hydropower capacity in this country. <br />The loss of power production as a result of minimum streamflows requires a more <br />defined operating analysis in the early stages of licensing and relicensing to determine <br />whether the project is or will remain economically feasible. The minimum flow re- <br />quirements also necessitate the development of a more detailed operating scenario <br />before construction of a licensed project. This ensures that the estimate of average annual <br />energy production and dependable capacity presented to the purchaser are established <br />at a conservative point in order to maintain agreements established in power sales <br />contracts. The requirement to establish minimum flows can reduce storage which will <br />decrease the amount of dependable capacity available, thus lowering the plant factor. <br />Even at navigation locks and dams on the American waterways system, environmental <br />resource agencies now sometimes require minimum flows in addition to the leakage <br />and lockage losses. The reduction of energy and capacity during the peak periods by <br />storage drawdowns, on a continuous basis, may also significantly impact overall system <br />capabilities throughout the country. In many cases, a ponding or designated storage <br />operation at existing facilities was the basis for establishing feasibility of the projects. <br />Minimum continuous flow requirements may require that peaking plants be converted <br />to run-of-river projects, thus changing the original intent of these projects and degrading <br />their value. <br />With the establishment of minimum flow requirements by resource agencies, FERC <br />is required to incorporate new articles into the licenses for monitoring minimum flow <br />compliance. Minimum flow requirements are to be monitored on a continuous basis <br />and deviations from minimum flows are to be reported immediately to FERC. In those <br />Rivers • Volume 1, Number 1 Pages 3-5 3 '?