Laserfiche WebLink
<br />1 <br />1 <br />1 <br />Green Mountain <br />Date Release <br />w/CROS (cfs) Release w/o <br />CROS (cfs) Release for <br />CROS (cfs) Acre-feet <br />5/30/97 875 800 75 149 <br />5/31/97 1111 800 311 617 <br />6/1/97 1282 800 482 956 <br />6/2/97 1461 1000 461 914 <br />6/3/97 1478 1008 470 932 <br />TOTAL 3,568 <br />Dillon <br />Denver Water participated in the Coordinated Reservoir Operations study process, however, no releases <br />from Dillon Reservoir were made during 1997. Dillon Reservoir was prepared to make bypasses, but it <br />was determined that they would not have been passed through Green Mountain Reservoir due to capacity <br />limitations at the Green Mountain Reservoir Hydropower Plant. <br />Williams Fork <br />Date Release <br />w/CROS (cfs) Release w/o <br />CROS (cfs) Release for <br />CROS (cfs) Acre-feet <br />6/2/97 369 238 131 260 <br />6/3/97 451 238 213 422 <br />6/4/97 473 369 104 206 <br />6/5/97 480 451 29 58 <br />TOTAL 946 <br />Wolford Mountain <br />1 <br />Date Release w/CROS <br />(cfs) Release w/o <br />CROS (cfs) Release for <br />CROS (cfs) Acre-feet <br />5/30/97 143 143 143 284 <br />5/31/97 501 501 501 994 <br />6/1/97 873 873 873 1,732 <br />6/2/97 982 982 982 1,948 <br />6/3/97 992 992 992 1,968 <br />6/4/97 970 970 970 1,924 <br />6/5/97 901 901 901 1,787 <br />TOTAL 10,637 <br />Wolford Mountain Reservoir was full and spilling all inflow during the time that Coordinated Reservoir <br />Operations were occurring. <br />• Granby <br />Reservoir operators for Northern Colorado Water Conservancy District participated in the Coordinated <br />Reservoir Operations study process, however, no releases from Granby Reservoir were made during 1997 <br />as there was no need for additional water due to the high flows at the time. <br />1 <br />12