Laserfiche WebLink
d. Extraordinary conservation programs existing as of January 1, <br />2006 <br />e. Other extraordinary conservation measures as agreed upon by the <br />States <br />3. If conditions during the year change due to weather or other unforeseen <br />circumstances, a Contractor may request a mid-year modification of its <br />water order to reduce the amount of ICS credits created during that year. <br />A Contractor cannot increase the amount of ICS credits it had previously <br />scheduled to create during the year. <br />4. Any ICS credits would be used first to offset any overrun for that year or <br />future year(s). <br />5. The maximum amount of ICS credits that can be created during any year <br />through extraordinary conservation is limited to each state as listed below. <br />a. California: 400,000 acre-feet per year <br />b. Nevada: 125,000 acre-feet per year <br />c. Arizona: 100,000 acre-feet per year <br />6. The maximum cumulative amount of ICS credits created through <br />extraordinary conservation that would be available at any one time is: <br />a. 1,500,000 acre-feet for California; <br />b. 300,000 acre-feet for Nevada; and <br />c. 300,000 acre-feet for Arizona. <br />7. No category of surplus water can be used to create ICS credits. <br />8. At the time the ICS credits are created by extraordinary conservation, the <br />Contractor will dedicate 5% of the ICS credits to the system on a one-time <br />basis to provide a water supply benefit to the system. Additionally, ICS <br />credits will be subject to annual evaporation loss (estimated to be no more <br />than 3% annually) during each year in which no shortage has been <br />declared. The Secretary will not assess any other charge for creating ICS <br />credits. <br />9. Contractors that have created ICS credits may recover them under the <br />following conditions: <br />a. A Contractor may request delivery of ICS credits it has created at <br />the time it submits its annual water order for the following year. <br />The ICS credits would be added to the Contractor's approved <br />water order for that year upon approval by Reclamation. <br />9