Laserfiche WebLink
<br />. <br /> <br />would provide propagation, research, broodstock holding, refugia and public educational <br />opportunities for endangered fish species, which has not been attempted previously in this <br />region. Due to current uncertainties about culture and large scale production techniques <br />for these fishes, it was necessary to make some assumptions during the course of the study <br />on the development and operation of the hatchery facility. The proposed facility could <br />ultimately consist of a fish hatchery, a broodstock and refugia holding facility and a research <br />facility, as deemed necessary by the Recovery Program. <br /> <br />The study was performed by a team of consulting engineers and biologists and a Technical <br />Advisory Committee (T AC). The T AC was responsible for overall direction of the study <br />and was composed of staff representatives from the CWCB, Colorado Division of Wildlife <br />(CDOW) and the U. S. Fish and Wildlife Service (USFWS). The Consultant Team <br />consisted of URS Consultants, Inc., prime contractor, with major responsibility for the site <br />evaluation and engineering; Fish Pro, Inc., specializing in fish biology and hatchery design; <br />Bio/West, Inc., specializing in fish biology and life history needs, and Leonard Rice <br />Consulting Water Engineers, specializing in the investigation of water supply aspects of the <br />study. <br /> <br />. The study tasks are grouped into six categories as listed below: <br /> <br />literature Review and Review of Existing Propagation Facilities <br />Biological Design and Culture Techniques <br />Site Identification and Initial Screening <br />Site Evaluation and Final Screening <br />Recovery Facility Design and Cost Estimates <br />Issues and Permits <br /> <br />. <br /> <br />. <br /> <br />During the course of the study the TAC and the Consultant Team made modifications to <br />the study scope and direction, as the study progressed and knowledge was gained. At the <br />completion of each major task, a task report was prepared to present the findings and <br />conclusions of the task. This Final Report serves two purposes: 1) to assemble in a <br />summary report containing a description of each of the completed tasks, the final <br />conclusions and associated technical appendices; and 2) to present a record of the study <br />direction and progress toward completion. In general, the interim task reports were <br />compiled and revised to prepare this final report. <br /> <br />. <br /> <br />1.0 - 2 <br />