Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />TABLE 7 <br /> <br />COSTS AND REQUIRED LAND <br />COLD WELL WATER SUPPLY (SCENARIO 2 - 300,000) <br /> <br />Core Facility <br /> <br />Recovery Facility Components <br /> <br />Refugia/Broodstock Research <br /> <br />Residences (3) Quarantine Building <br />Hatchery Building Broodstock Building <br />Maintenance/Storage Facility Brood Ponds <br />Visitor Aquarium Facll/ty Broodstock Water Supply <br />Production Ponds Other Associated Costs (a) <br />Brood Ponds (Augment Only) <br />RearlngWater Supply <br />Other Associated Costs (a) <br /> <br />II <br /> <br />Totals <br /> <br />$19,551,000 <br /> <br />$2,664,000 <br /> <br />Research Building <br />Outside Research <br />Labratory Equipment <br />Other AssocIated Costs (a) <br /> <br />II <br /> <br />$3,010,000 <br /> <br />(a) Other associaled costs may include some or all 01 the lollowing: <br />Site work <br />Utilities <br />Emergency Power Generation <br />Gas Stabilization Tower <br />Miscellaneous Structures <br />Effluent Treatment <br />Yard Piping <br />Oxygen System <br />Monitoring and Alarm System <br />Fish Rearing Equipment <br />Process Water Conditioning <br />Additional cost lor heaters and heat exchangers <br />AlE Fees (9.5% 01 Total) <br />Permits (.5% 01 total) <br />Contingency (15CMt 01 Total) <br />(b) Land costs not Included due to unspecified site location. <br /> <br />Total <br /> <br />All Options <br /> <br />Operation <br /> <br />and <br />Maintenance <br />All Functions <br /> <br />II $25,225,000 I I $979,000 I I <br /> <br />. <br /> <br />Required <br />Land (b) <br /> <br />Acres <br /> <br />81 <br />