Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE 5 <br /> <br />FLOW AND REARING UNIT REQUIREMENTS <br /> <br />(Warm Well Water Supply - 690F) <br /> <br />EXTENSIVE CULTURE <br /> <br />SPECIES PRODUCTION JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC <br /> LEVEL <br />Colorado Squaw'lsh - 4" 150,000 <br />Total Flow Requirement (GPM) 185 185 201 87 87 185 185 174 174 174 174 174 <br />Total Trough Requirement 4 <br />Total Pond Reauirement 17 17 18 8 8 17 17 16 16 16 16 16 <br />Razorback Sucker - 6n 150,000 <br />Total Flow Requirement (GPM) 152 152 4 87 76 152 152 152 152 152 152 152 <br />Total Trough Requirement 3 <br />Total Pond Reauirement 14 14 8 7 14 14 14 14 14 14 14 <br />Bony tall Chub - 4" 150,000 <br />Tolal Flow Requiremenl (GPM) 4 68 68 148 148 <br />Totsl Trough Requirement 3 <br />Total Pond Reauirement I 6 6 13 13 <br />Humpback Chub - 6" 150,000 <br />Tolal Flow Requirement (GPM) 4 65 65 141 141 <br />Total trough Requirement 3 <br />Totsl Pond Reauirement 6 6 13 13 <br />SUBTOT ALS EXTENSIVE <br />FLOW REQUIREMENT (GPM) 337 337 205 174 171 470 470 615 615 326 326 326 <br />TROUGH REQUIREMENT 0 0 7 0 6 0 0 0 0 0 0 0 <br />POND REQUIREMENT . 31 31 18 16 15 43 43 56 56 30 30 30 <br />TOTAL INTENSIVE AND EXTENSIVE <br />FLOW REOUIREMENT(GPM) 3775 4481 710 663 1102 2550 3018 4840 4990 2279 2659 3232 <br />TROUGH REQUIREMENT 0 0 10 50 12 2 10 28 0 0 0 0 <br />CIRCULAR REQUIREMENT 36 46 5 6 8 12 8 15 29 14 21 27 <br />POND REQUIREMENT 31 31 18 16 15 43 43 56 56 30 30 30 <br /> <br />Nole: Table is for Scenario 2 - Total production of 300,000 per species. with extensive cullure of 150,000. <br />