Laserfiche WebLink
<br />~ <br /> <br />,. <br /> <br />United States" is regulated through Seotion 404, which is jointly <br />administered by EPA and the u.s. Army Corps of Engineers.!! The <br />final component of pollution control envisioned by the CWA is <br />Section 401, which requires that a state "certify" that the <br />issuance of a requested permit under the CWA, will comply with <br />applicable state water quality standards. <br /> <br />Dams and diversions are not within the scope of <br />Section 402 of the CWA,l! and the only permitting requirement is <br />for new projects which require a 404 permit.!! Instead, they <br />have been included, by default, within the category of nonpoint <br />sources. Although the Section 319 nonpoint program is only <br />voluntary, EPA has frequently expressed an intent to change it <br /> <br />!f The Corps has primary responsibility for permit processing. <br />Howeyer, EPA has the ultimate authority over decisions <br />regarding the scope of applicability of 404, and the Corps <br />must incorporate and accept EPA's 404(b)(1) guidelines in <br />its permitting decisions. EPA also has the authority to <br />"veto'. a Corps decision to issue a 404 permit under 404 (c) . <br /> <br />~/ InNWF v. Gorsuch, 693 F.2d 156 (D.C. Cir. 1982), the <br />environmental community argued that dam-induced water <br />quality impacts, such as low dissolved oxygen, temperature <br />changes and sediment releases, constituted the discharge of <br />pollution from a point source and therefore required an <br />NPDES permit under Section 402 of the CWA. The federal <br />appeals court disagreed. That court essentially held that <br />EPA's administrative interpretation of the term "discharge <br />of pollutant" to exclude these and other water quality <br />impacts of a dam was reasonable and entitled to deference, <br />and that Section 402 did not apply unless 1) a pollutant was <br />2) added 3) to navigable waters 4) from 5) a point source. <br />However, the court left open the possibility that a dam or <br />diversion could be regulated under Section 402 if a <br />discharge of pollutant was found to exist. The <br />environmental community then tried, in a later case, to <br />argue that the discharge of dead fiah and fish parts from a <br />hydroelectric facility was within the scope of 402, but the <br />court again disagreed, because the fish were not "added" to <br />the water by the hydro facility. <br /> <br />~I However, this does not mean that water quality standards are <br />not relevant to water projects, as the construction of a new <br />dam or diversion requires a 404 permit, which cannot be <br />issued without a 401 certification that the state water <br />quality standards (developed primarily for the NPDES <br />program) will not be violated. <br /> <br />'1 <br />