Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-' <br /> <br /> <br /> <br />, <br />I <br />I <br />I <br /> <br /> <br />to the extent possible, minimize cost by performing the surveys in conjunction with other <br />funded work in the vicinity of each site. <br /> <br />8. Aerial photography of adjustable reaches of the Yampa and Green River systems will be <br />taken during the first year, and should be repeated after subsequent high-flow years to <br />provide a means of documenting changes in channel width and vegetation patterns. <br />Ideally, the entireYampa River downstream from Cross Mountain, and the Green River <br />from Flaming Gorge Dam to the Colorado River confluence should be photographed. At <br />a minimum, the photographed reaches should include Deerlodge Park, Echo Park, <br />Rainbow-Island Park, the reach between Split Mountain and Sand Wash, and a <br />Canyonlands reach. <br /> <br />9. An annual report will be prepared that summarizes the data that were collected during that <br />year, presents comparisons of the newly collected data with previous data, and provides <br />an evaluation of the relationship between the magnitude and duration of the discharges, <br />the relative sediment transport balance through the system and the morphological changes <br />to the river channel. <br /> <br />10. After the third year of the program, a more detailed evaluation of the results should be <br />prepared for publication as a USGS Water-Resources Investigations report. This report <br />will focus on trends in both the sediment load and morphometric (cross section) data, and <br />their implications to management decisions that would provide flows to maintain or improve <br />habitat conditions for the endangered fish. <br /> <br />A summary of the work tasks and the proposed schedule is presented in Table 1. <br /> <br />3.6 Deliverables and Estimated Budget <br /> <br />The anticipated deliverables, schedule and estimated budget for the first two years of the <br />sediment monitoring program are summarized in the following sections. <br /> <br />3.6.1 FY-98 Work <br /> <br />Deliverables: <br /> <br />The field work will be performed between early April and late summer, as described above, <br />and the annual report will be completed by October 1, 1998. <br /> <br />Budaet: <br />Bv Task: <br /> <br />By Cost Category: ' <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />1. <br />Total <br /> <br />$ 5,000 <br />7,400 <br />35,800 <br />19,100 <br />25,000 <br />42,600 <br />39,500 <br />1 0,000 <br />2.000 <br />$186,400 <br /> <br />Labor: <br />Travel: <br />Equipment: <br />Other: <br />Total: <br /> <br />$139,900 <br />15,200 <br />1,900 <br />29.400 <br />$186,400 <br /> <br />6 <br /> <br />Mussetter Engineering. Inc. <br />