My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9398
CWCB
>
UCREFRP
>
Public
>
9398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:35 PM
Creation date
5/22/2009 4:33:01 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9398
Author
SWCA, I.
Title
Feasibility Assessment for a Multi-Species Management Program, Lower Colorado River.
USFW Year
1994.
USFW - Doc Type
Salt Lake City.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />Degree to which an alternative provides opportunities for the Participants to influence the <br /> <br />outcome of the compliance process. <br /> <br />. <br /> <br />Estimate cost and time to develop an alternative. <br /> <br />. <br /> <br />Estimate cost and time to implement an alternative. <br /> <br />. <br /> <br />Precedent. <br /> <br />. <br /> <br />Authority. <br /> <br />. <br /> <br />Degree to which an alternative accommodates current and future hydropower and water <br />project operational flexibility. <br /> <br />. <br /> <br />Ability of an alternative to provide certainty during plan development. <br /> <br />. <br /> <br />Ability to develop a comprehensive, coordinated conservation strategy. <br /> <br />In the analysis, each alternative was evaluated according to the degree to which, or the way in <br />which, it met each criterion. To facilitate comparison of the 153 discrete evaluations <br />(9 alternatives x 17 criteria), a matrix table was devised (see following page) using a simple <br />rating system based on a "lowest-Iow-moderate-high-highest" scale. Where that scale was <br />inappropriate (under the cost- and time-related criteria), dollar amounts and years were used <br />instead. <br /> <br />FINAL REPORT <br /> <br />December 20, 1994 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.