Laserfiche WebLink
<br />Table 2. (Concluded) <br /> <br />Title <br /> <br />General description <br /> <br />Applicable <br />situations <br /> <br />Wyoming water <br />development <br />program <br />(see page 71) <br /> <br />Statewide water project <br />planning, design and <br />construction program <br />encourages evaluation of <br />projects with recreation, <br />fisheries, and wildlife <br />management potential, <br />including instream flow <br />opportunities. <br /> <br />Individual water <br />projects <br /> <br />Major industrial/ <br />energy project <br />review <br />(see page 73) <br /> <br />Major industrial/energy <br />projects are required to <br />obtain State permits for <br />construction and operation. <br />Such permits may require <br />certain mitigation measures <br />to minimize project impacts. <br /> <br />Individual major <br />industrial/energy <br />project facilities <br /> <br />State water <br />records analyzed <br />(see page 74) <br /> <br />Careful water record <br />examination theoretically <br />can reveal extent to which <br />protection of instream <br />flows may be necessary under <br />various previously listed <br />strategies. <br /> <br />Statewide to <br />individual stream <br />segment <br /> <br />6 <br />