My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9593
CWCB
>
UCREFRP
>
Public
>
9593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:36 PM
Creation date
5/22/2009 12:56:40 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9593
Author
Tetra Tech Inc.
Title
Concept Development Report Hartland Diversion Dam Fish Passage Structure Delta, Colorado.
USFW Year
2000.
USFW - Doc Type
Grand Junction, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.4 Spill Channel Operations <br />Two gates on the Hartland Ditch divert flows into the spill channel by backing water up <br />and forcing excess flows to spill into the channel. Diversion to the spill channel is through a <br />4.5-foot opening with flashboards to create a weir spill. A second opening adjacent to the <br />flash boards is gated and typically stays closed during normal operations. Water passes over <br />the flashboards into an open concrete box and then into an open channel leading immediately <br />to a 36-inch culvert. From the culvert, flows enter a 350-foot long open channel that slopes <br />. back into the Gunnison River (Drawing 5, Appendix A). <br />2.5 Dam Structure <br />The dam structure is approximately 300 feet wide and spans the entire Gunnison River. <br />The elevation at the crest of the dam varies between 4952.4 and 4953.0. The channel bed <br />elevations also vary along the toe of the dam and at an approximate elevation of 4948. Scour <br />holes exist along the east bank toe at elevation 4946. The water surface over the top of the <br />dam drops a total of 4.5 feet in low flow conditions and is less than 1 foot when flows in the <br />river reach or exceed the 5-year event. The east bank elevation ranges from 4957 to 4962, <br />where a small berm has been constructed to redirect overtopping flows back into the river <br />when elevations exceed 4957. The west bank rises steeply and is at least 20 feet above the <br />main river channel. <br />The dam consists of railroad iron driven vertically into the riverbed and horizontally <br />placed steel cribbing (Hie 2000). The cribbing is filled with river cobbles and boulders. The <br />structure was repaired in 1942 (HIC 2000). HIC reports that the dam functions very well and <br />they have no immediate or future needs for repair or reinforcing. The only feature of the dam <br />that causes some problems is that the dam snags debris and trees that are floating in the river <br />(HIC 2000). This is a typical maintenance requirement at any low head diversion dam where <br /> <br />5 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.