Laserfiche WebLink
<br />FINAL REPORT, November 2003 <br />High-flow Requirements for the Duchesne River <br /> <br />Wissiup Return reach (Figure 2). Surveys of channel geometry were also conducted at three <br />additional study sites (Figure 2, sites 4,5, and 6). River locations within this report are <br />sometimes referred to in terms of local landmarks, such as the Bowtie, Pipeline, Grey Bluff, and <br />the Oil Shack (Figure 2). <br /> <br />7 <br />