Laserfiche WebLink
<br />Table 2.1 (continued) <br />Summary of Requests for Green Mountain Water Sales <br /> <br />Location and <br />requestor <br /> <br />Point of diversion <br /> <br />Volume <br />requested <br />by category <br />(ac-ft) <br /> <br />Colorado River (continued) <br /> <br />Clifton Water District <br />and City of Grand <br />Junction <br /> <br />Colorado River <br /> <br />500 Municipal <br /> <br />Middle Park Water <br />Conservation District <br /> <br />Colorado River <br /> <br />500 Municipal <br /> <br />Water users located above Dillon Reservoir in Summit County must provide <br />augmentation water for Denver's Dillon Reservoir and Roberts Tunnel diver- <br />sion system in addition to the downstream Shoshone and Cameo calls. Water <br />users below G1enwood Canyon need only provide water for the downstream <br />Cameo calls and other downstream calls that may be perfected. <br /> <br />If long-term contracts from Green Mountain water sales are not avail- <br />able, each entity would be required to turn to either interim Green Moun- <br />tain contracts or other sources of water for augmentation purposes or <br />curtail their present or future water use. Depending on the location and <br />intended use of the water, a number of sources other than Green Mountain <br />are available (see Section 2.3). <br /> <br />2.2. Alternatives Considered in Detail <br /> <br />Alternative 1 - No-Action Alternative. This alternative reflects the <br />present reservoir operational practices under Senate Document 80. This can <br />be considered the baseline alternative in that water use patterns based on <br />historic flows would continue. Water may continue to be available for <br />interim water sales contracts (as with the present interim sales which <br />range from 1,200 to 1,400 acre-feet), but there would be no long-term <br />contracts for water sales. Environmental impacts of such sales would be <br />addressed on a year-by-year, case-by-case, basis and adverse impacts <br />mitigated as required. <br /> <br />2-5 <br />