Laserfiche WebLink
<br />. <br /> <br />Given this informatioll. Reclamation was able to generate four tables that determine the impacts <br />of these federal projecls on the Price River Basin for a wet, dry and average water year. These <br />water years were 1984, 1977, and 1968 respectively. Table 1.1 ;illustrates the theoretical virgin <br />flows of the Price River at Woodside. This table was developed using the historical USGS gauge <br />data at Woodside plus the total depletion of the Price River identified by the Area Engineer <br />minus the return flow. Table 1.2 shows the Environmental Baseline of the Price River at <br />Woodside. Table 1.2 was determined by taking the total depletion of the Price-San Rafael River <br />Salinity Control Project and adding the total depletion minus the return flow. Table 1.3 <br />illustrates the Average Monthly Flows of the Price River at Woodside that would result from <br />depletions from Scofield Reservoir, the Price-San Rafael River Salinity Control Project, and the <br />proposed Narrows Project. This table was developed by taking the results found in Table 1.1 and <br />subtracting Table 1.2, and the total depletion from the proposed Narrows Project. Table 1.4 <br />shows the Average Monthly Flows of the Price River at Woodside that would result from <br />depletions from Scofield Reservoir and the Price-San Rafael River Salinity Control Project. <br />Table 1.4 was determined by taking Table 1.1 minus Table 1.2. <br /> <br />/[ <br /> <br />WW~L ~1~ ~ fh~dz U5<5 ;)~ ~( ? <br />