Laserfiche WebLink
<br />Proposal NO.5. Install a Stoplog Check Structure. The estimated added cost of this proposal is <br />$68,600 before adding any study and/or implementation costs. <br /> <br />Proposal NO.6. Implement Option E instead of Option A. The estimated added cost of this <br />proposal is $1,739,000 before adding any study and/or implementation costs. <br /> <br />Proposal NO.7. Install a Siphon to Use Orchard Mesa Irrigation District Water. The estimated <br />added cost of this proposal is $967,500 before adding any study and/or implementation costs. <br /> <br />Proposal NO.8. Electrical Barrier. The estimated savings of this proposal are $1,145,000 before <br />deducting any study and/or implementation costs. <br /> <br />Other Ideas: The Team identified 15 additional ideas for further consideration and development <br />that are listed in the "Disposition of Ideas" table near the end of this report. <br />