<br />Executive Summary ............................................................ 1
<br />
<br />Value Study Team Members ..................................................... 3
<br />
<br />Acknowledgment of Design Team and Consultant Assistance. . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
<br />
<br />Value Method Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
<br />
<br />Current Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
<br />
<br />Figure 1. Project Vicinity Plan. ................................................... 6
<br />
<br />Figure 2. Project Location Map. . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . 7
<br />
<br />
<br />Figure 3. Existing Site Conditions. ... .". . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
<br />
<br />Figure 4. Baseline Option Site Plan. ..................................... . . . . . . . . . . 9
<br />
<br />Figure 5. Bypass Pipe Alignment. (Typical) ........................................ 10
<br />LIFE CYCLE COST ANALYSIS - Current Operations and Baseline Concept (Option A) ...... 11
<br />
<br />Function Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
<br />
<br />Function Analysis System Technique (FAST) ....................................... 13
<br />
<br />Proposal No. 1A. Monitoring Endangered Fish Movement into the Grand Valley Irrigation
<br />Company Canal, Grand Junction, Colorado. . . . . . . . . .. . . . . . . . . . . . . . . 14
<br />
<br />Figure 6. Overview Plan Proposal No. 1 A. ......................................... 17
<br />
<br />Proposal No. 1 B. Monitoring Endangered Fish Movement into the Grand Valley Irrigation
<br />Company Canal, Grand Junction, Colorado (Seines) ................. 18
<br />
<br />Proposal No. 1 C. Hydraulic and Biological Studies (Laboratory and Field). .............. 21
<br />
<br />Proposal NO.2. Install the Trashrack In Front of the Headgates. ..................... 24
<br />
<br />Figure 7. Overview Plan Proposal NO.2. .......................................... 25
<br />
<br />Proposal NO.3.
<br />
<br />Build a Sedimentation Basin in the River. .......................... 26
<br />
<br />Figure 8. Overview Plan Proposal NO.3. .......................................... 28
<br />
<br />Proposal NO.4.
<br />
<br />Install a Sluice Pipe at the Silt Ledge. ............................. 29
<br />
|