My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8110
CWCB
>
UCREFRP
>
Public
>
8110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:33 PM
Creation date
5/20/2009 3:30:26 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
8110
Author
FLO Engineering, I.
Title
Green River Flooded Bottomlands Investigation Ouray Wildlife Refuge and Canyonlands National Park, Utah-Final Report.
USFW Year
1996.
USFW - Doc Type
Breckenridge, CO.
Copyright Material
NO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 3a. Ouray Reach Cross Sections - Scour and Fill Cycle <br /> <br />Cross Section Net Change in <br />Numberl Bed Elevation Comments <br />OCW 1 No net change. 9 ft fill on left side. 2.5 ft of scour on right side. 3 ft of right overbank <br /> deposit. <br />OCW 2a2 Net fill. 12 ft fill on right bank, 50 ft wide sand bar deposit. <br />OCW 2b2 Net scour. 2 ft lower thalweg, 1.5 ft of overbank deposits. <br />OCW3 No net change. I - 2 ft of scour in main portion of channel. <br />OCW 43 Net fill. Main channel filled during peak flows. 2 ft of deposit on 420 ft ofleft <br /> channel. Right channel did not change. <br />OCW5 Net scour. Narrow cross section. Thalweg is 5 ft lower. <br />OCW6 Net fill. Sand bar deposit in main channel. Slight left overbank deposits. <br />OCW7 No net change. Uniform cross section. Deep thalweg scour during peak flow (6 ft). <br /> Refilled 9 ft on the falling limb of the hydro graph. <br />SHE 8 No net change. Some bar deposition in main part of channel during peak flow. <br />SHE 9 Net scour. Thalweg is 4 ft deeper. Slightly deeper scour during peak flow. <br />SHE 9.5 No net change. Thalweg deepened 2 ft during runoff as well as middle third of channel. <br /> Left third of channel filled an average of 4 ft. <br />SHE 10 Net fill. 170 ft of sand bar deposition (8 ft high) from right bank. 2.5 ft of channel <br /> scour in channel. Thalweg was 6.5 ft lower during peak flows. <br />SHE 10.5 No net change. 4 ft of fill in center of channel. Thalweg development along left bank (4 ft <br /> deeper). Cross section fill during peak flow. <br /> .. <br />WYB 11 Net fill. 3 ft high bar development along left .bank, 120 ft extension into channel. <br /> Minor deposition in center of channel. <br />WYB 11.5 No net change. 3 ft of scour on left two-thirds of channel. 5 - 7 ft of deposit on right one- <br /> third of channel. Channel fill during peak. <br />WYB 12 No net change. 2 - 3 ft of deposit along left bank. 2 ft of scour in main part of channel. <br />WYB 13 Net scour. Thalweg development along right bank. 5 ftof scour. <br />WYB 14 No net change. There were two areas of deposit and two areas of scour with 1 - 3 ft of bed <br /> elevation change. <br />WYB 15 No net change. The thalweg along the left bank was filled which was balanced by 1 to 2 ft <br /> of scour in the rest of the channel. <br />LEB 16 No net change. The thalweg flip-flopped. The thalweg near the left bank filled with 8 ft of <br /> sand deposit while a new thalweg developed on the right one-third of the <br /> channel to the same depth. Center bar was also scoured out. <br />LEB 17 No net change. Fairly uniform channel which become more uniform in shape. Some fill <br /> during the peak flow. <br /> <br />23 <br /> <br />e <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.