My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9609
CWCB
>
UCREFRP
>
Public
>
9609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:37 PM
Creation date
5/20/2009 3:28:16 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9609
Author
U.S. Bureau of Reclamation.
Title
Ruedi Reservoir 2012 Agreement Final Environmental Assessment Fryingpan-Arkansas Project.
USFW Year
2002.
USFW - Doc Type
Loveland, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I Ruedi 2012 Agreement Draft EA 1-7 <br />Table 1.2. Issue Summary and Disposition. <br /> <br />P <br />1 <br />t <br /> <br />1 <br /> <br /> <br />1 <br /> <br />J <br /> <br />1 <br /> <br />ISSUE/CONCERN DISPOSITION <br />1. a) Flows from Ruedi Reservoir releases made under the a) Discussed in Environmental Consequences Section <br />proposed agreement will destroy fisheries in the Fryingpan 4.2.2; addressed in Section 2.1.2. <br />River. <br />b) Flows from Ruedi Reservoir releases made under the b) Discussed in Environmental Consequences Section <br />proposed agreement will negatively impact brown trout 4.2.2; addressed in Section 2.1.2. <br />redds and the natural reproduction of the species. <br />c) Flows from Ruedi Reservoir releases made under the c) Discussed in Environmental Consequences Section <br />proposed agreement may cause low flow releases from the 4.2.2; addressed in Section 2.1.2. <br />reservoir during the winter, negatively affecting wintering <br />habitat for fish. <br />2. Flows from Ruedi Reservoir releases made under the Discussed and addressed in Environmental Consequences <br />proposed agreement will negatively impact economies of Section 4.2.4. <br />the Fryingpan and Roaring Fork valleys. <br />3. a) Flows greater than 250 cfs from Ruedi Reservoir a) Discussed in Environmental Consequences Section 4.2.1 <br />releases made under the proposed agreement negatively and 4.2.3; addressed in Section 2.1.2. <br />impact recreation in the Fryingpan and Roaring Fork <br />valleys. <br />b) Flows from Ruedi Reservoir releases made under the b) Discussed in Environmental Consequences Section <br />proposed agreement may reduce water levels and 4.2.1 and 4.2.3. <br />negatively impact recreation at the reservoir. <br />4. Flows from Ruedi Reservoir releases made under the Discussed in Environmental Consequences Section 4.2.1; <br />proposed agreement will cause physical damage to the addressed in Section 2.1.2. <br />stream banks of the Fryingpan River. <br />5. Fluctuating flows from Ruedi Reservoir releases made Discussed in Environmental Consequences Section 4.2.2; <br />under the proposed agreement will negatively impact macro addressed in Section 2.1.2. <br />invertebrate production. <br />6. Concern exists that the west slope water users' Developed Alternative B in response to this issue. <br />commitment to provide 5,412.5 af/year from Wolford <br />Mountain Reservoir may not be achievable some years due <br />to extraordinary operation and maintenance circumstances, <br />yet there may be unused contracted water available in <br />Ruedi Reservoir. Shortages such as this can occur due to <br />events beyond human control and may be as frequent as 1 <br />out of every 10 years. <br />7. Interest has been expressed in using 10,825 of of Ruedi Developed Alternative C in response to this issue. <br />Reservoir's uncommitted yield to enhance 15 Mile Reach <br />flows and/or fulfill water users' obligations. (This request <br />to make 10,825 of of the uncommitted yield available <br />would be in addition to the 10,825 of made available <br />through the proposed long-term agreement.) <br />8. The Proposed Action will negatively affect the Discussed in Environmental Consequences Section 4.2.5. <br />hydropower plant at Ruedi Reservoir. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.