Laserfiche WebLink
I-A <br />9 <br />e <br />e <br />62R -Crash Canyon <br />as r? su=c==rmwal <br />te: 04/05193 -OVIY94 <br />wale Place COOIr1 MCS <br />F-I Erosion Om to -4.Om <br />. Erosion > 4.Om to -8.Om <br />M Erosion > -8.Om <br />a Deposition <br />=+ Main Current Direction <br />---y Eddy Current Direction <br />Scale 1:1000 <br />Figure 10: Contour map of the difference between the April 5, 1993, and April 13, 1993, topographic surveys at the RM62.4 sandbar study site.