My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8211
CWCB
>
UCREFRP
>
Public
>
8211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:33 PM
Creation date
5/20/2009 3:27:41 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
8211
Author
U.S. Bureau of Reclamation and Fish and Wildlife Service.
Title
Final Environmental Assessment
USFW Year
1997.
USFW - Doc Type
Providing Fish Passage at the Grand Valley Irrigation Company diversion Dam on the Colorado River.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX D <br />SUMMARY OF CONSTRUCTION, OPERATION, AND MAINTENANCE AGREEMENTS <br />for the <br />PROPOSED FISH PASSAGE AT GRAND VALLEY <br />IRRIGATION COMPANY DIVERSION DAM <br />Bureau of Reclamation (Reclamation) Responsibilities <br />• Secure all land interest necessary for construction and access. <br />• Administer construction documents to construct the passage improvements. <br />• Provide flow enhancement, as needed, to operate the passage improvements while <br />allowing GVIC to maintain their diversion rights. <br />• Provide GVIC access across the fish passageway notch to operate and maintain the <br />diversion dam. <br />• Notify GVIC whenever access to the site is necessary. <br />Fish and Wildlife Service (Service) Responsibilities <br />• Through the Recovery Program, arrange/provide funding for long term operation and <br />maintenance of the fish passage and, if needed, for fish screens on the GVIC Canal <br />inlet. <br />• Through the Recovery Program, monitor fish use of the passage at the diversion dam. <br />• Cooperate with GVIC in all operations. Provide GVIC access across the fish passage <br />notch to operate and maintain the dam. <br />• Notify GVIC whenever access to the site is necessary. <br />Grand Valley Irrigation Company (GVIC) Responsibilities <br />• Convey a land interest to Reclamation for the purposes of construction of the riffle and <br />pool fish passage facilities and access to the riprap for maintenance. <br />• If desired, be responsible for construction, operation, and maintenance of the fish <br />passage improvements with funding from the RIP and the Service or a trust. <br />• Be responsible for placing stop logs in passageway notch if needed to obtain their full <br />water rights. <br />• Be responsible for operation, and maintenance of fish screens, if needed, with funding <br />from the Service or a trust. <br />• Allow limited access to observe the operation of the passageway. <br />Recovery Implementation Program (RIP) Responsibilities <br />Provide funding for construction of the fish passageway. <br />D-1
The URL can be used to link to this page
Your browser does not support the video tag.