My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9631
CWCB
>
UCREFRP
>
Public
>
9631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:37 PM
Creation date
5/20/2009 3:26:40 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9631
Author
U.S. Bureau of Reclamation.
Title
Operation of Flaming Gorge Dam Draft Environmental Impact Statement Executive Summary.
USFW Year
2004.
USFW - Doc Type
Salt Lake City, UT.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In 1978, the dam was retrofitted with a selective withdrawal structure to improve water <br />temperatures for the tailwater trout fishery. During the third phase, from 1979 to 1984, <br />operations were similar to those in the previous phase except for use of the selective <br />withdrawal structure and the occurrence of spills in 1983 and 1984. <br />During the fourth phase, from 1985 to 1992, Reclamation began to constrain the <br />operation of Flaming Gorge Dam to reduce negative impacts affecting endangered fishes <br />in the Green River. Such constraints reduced operational flexibility and the ability to <br />fluctuate flows to meet power system demands. In 1985, an interim flow agreement was <br />established between Reclamation and the U.S. Fish and Wildlife Service to change <br />Flaming Gorge Dam releases to protect critical nursery habitats for endangered fishes in <br />the Green River downstream from Jensen, Utah. The recommended releases were based <br />on observations made in 1985 that indicated "good" habitat conditions were available at <br />lower flows. Reclamation also revised operational criteria at the dam to avoid spills. <br />These changes were in place in the fourth phase, along with numerous research releases <br />to support preparation of the Final Biological Opinion on the Operation of Flaming <br />Gorge Dam issued on November 25, 1992. Significant financial impacts to hydropower <br />generation, identified in the DEIS, occurred mainly as a result of flow changes <br />implemented during this fourth phase. <br />In the fifth phase, from 1993 to present, Reclamation began making releases from <br />Flaming Gorge Dam in an attempt to meet the flow and temperature recommendations <br />given in the 1992 Biological Opinion. Flows recommended in the 1992 Biological <br />Opinion were intended to restore a more natural hydrograph and protect nursery habitats <br />of endangered fishes downstream from the Yampa River confluence. At the same time, <br />Reclamation continued to meet the authorized purposes of Flaming Gorge Dam- <br />regulating flows of the Green River, storing water, facilitating States' development of <br />water resources, providing recreational opportunities, generating hydroelectric power, <br />and improving conditions for fish and wildlife. <br />The Green River flows recommended in the 1992 Biological Opinion were based on the <br />most reliable scientific data available at the time. The opinion included several actions <br />Reclamation could take to avoid jeopardizing the recovery of endangered fishes in the <br />Green River. One of these actions was to collect more information about the flow <br />and temperature needs of the endangered fishes and, subsequently, to refine or modify the <br />flow and temperature recommendations of the 1992 Biological Opinion. A 5-year <br />research study began in 1992, and the resulting data and refinements were included in the <br />2000 Flow and Temperature Recommendations. The study included periodic test flows <br />to evaluate the effects of summer flows on endangered fishes or to test specific <br />hypotheses. <br />S.5 COMPLIANCE WITH THE ENDANGERED SPECIES ACT <br />To comply with the ESA, an evaluation of the effects of any discretionary Federal action <br />must be conducted by the action agency in consultation with the U.S. Fish and Wildlife <br />Service. <br />During the late 1970s and early 1980s, the U.S. Fish and Wildlife Service rendered <br />Jeopardy Biological Opinions for the Upalco, Jensen, and Uinta Units of the Central Utah <br />Project stating that all relied on the operation of Flaming Gorge Dam to provide flows for <br />endangered fishes. More recent Biological Opinions for the Duchesne River Basin, <br />Executive Summary ? S-5
The URL can be used to link to this page
Your browser does not support the video tag.