Laserfiche WebLink
Responsible Parties: NPS, Grand Canyon National <br />Park (GCNP); GCES Office. <br />Time to Complete: 6 months. <br />6. <br />Grand Canyon campsite stabilization and <br />recovery. <br />Major Premise: Due to the removal of sediment and <br />vegetation at certain Grand Canyon campsites by the <br />high flows (1983-85) and the reinitiation of <br />fluctuating flows from Glen Canyon Dam, critical <br />campsites in narrow reaches of the river corridor <br />in Grand Canyon National Park and Glen Canyon <br />National Recreation Area are impacted. Evaluation <br />of the potential for stabilization and recovery of <br />campsites by revegetation and renovation in Grand <br />Canyon (in addition to the sediment deposition <br />studies) will be made at the Cremation Camp (River <br />Mile 87) and Lower Bass Camp (River Mile 108). <br />Estimated Cost: $11,000 <br />Responsible Parties: NPS <br />Office. <br />(GCNP & GCNRA), GCES <br />Time to Complete: 6 months. <br />B. <br />TROUT FISHERY STUDIES <br />1. <br />Development of studies of the effect of <br />low and fluctuating flows on rainbow <br />trout. <br />Major Premise: The Assistant Secretaries' direc- <br />tive letter (June 16, 1988) called for additional <br />study of the trout fishery. This study will focus <br />on the Glen Canyon Dam tailwater and the effect of <br />low and fluctuation flow on the trout life stages, <br />water quality, spawning, food base, and biologic <br />productivity. These studies will also investigate <br />nutrient loading from Lake Powell and tailwater <br />trophic relationships. To equate operations with <br />trout survivorship and growth requires development <br />of the following technical information. <br />(a.) Development of specific technical <br />studies: Estimated Cost: $7500; Respon- <br />sible Parties: Arizona Game and Fish <br />8