Laserfiche WebLink
Executive Summary <br />J?, FE/S - Navajo Reservoir Operations <br />I 'A <br />Comparison of Alternatives <br />Table S-5 summarizes the impacts associated with each alternative retained for detailed <br />analysis. <br />Table S-5-Summary comparison of alternatives retained for further analysis' 2 <br />Resource No Action Alternative 250/5000 Alternative 500/5000 Alternative <br />Navajo Reservoir Reservoir operated for Reservoir operated Reservoir operated for <br />operations and content flood control and existing for flood control, flood control and <br /> uses; average July endangered fish, full endangered fish, <br /> content 1.52 million NIIP water supply; potential shortage to <br /> acre-feet. average July content NIIP water supply; <br /> 1.35 million acre-feet. average July content <br /> 1.3 million acre-feet. <br />San Juan River monthly Minimum flow 500 cfs; Minimum flow 250 cfs; Minimum flow 500 cfs; <br />flows at Archuleta (near average annual flow of average annual flow of average annual flow of <br />dam) 1,015 cfs; average July 775 cfs; average July 780 cfs; average July <br /> flow 1,050 cfs; average flow 385 cfs; average flow 540 cfs; average <br /> January flow 880 cfs. January flow 300 cfs January flow 500 cfs. <br />Lower San Juan River Minimum flow 65 cfs; Minimum flow 500 cfs;' Minimum flow <100 cfs <br />monthly flows average annual flow of average annual flow of when reservoir storage <br /> 1,900 cfs; average June 1,670 cfs; average June exhausted;' average <br /> flow 4,250 cfs; average flow 4,680 cfs; average annual flow of 1,670 cfs; <br /> August flow 1,570 cfs. August flow 1,110 cfs. average June flow <br /> 4,110 cfs; average <br /> August flow 1,170 cfs. <br />Water uses and Water supply adequate Water supply adequate Water supply adequate <br />resources to meet existing uses; to meet existing uses; to meet existing uses <br /> future water uses completion of NIIP and with possible shortages <br /> including NIIP ALP Project would in dry years; completion <br /> completion and ALP occur. Best opportunity of NIIP and ALP Project <br /> Project is uncertain. to accomplish future included with possible <br /> water development. shortages.