My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7401
CWCB
>
UCREFRP
>
Public
>
7401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/20/2009 3:24:05 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7401
Author
U.S. Bureau of Reclamation.
Title
Ruedi Reservoir, Colorado Round II Water Marketing Program, Final Supplement to the Environmental Statement, Fryingpan - Arkansas Projects, Colorado.
USFW Year
1989.
USFW - Doc Type
Billings, Montana.
Copyright Material
NO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.7 <br />recreational values on the Fryingpan River (paragraph 10, OP) is made through <br />a provision of minimum flows below the junction of the Fryingpan River and Rocky <br />Fork Creek. Also, the lands and surface waters of Ruedi Reservoir are open for <br />public recreation (paragraph 12, OP). <br />In order to conduct a second round of water sales, Reclamation has prepared <br />this Final Supplement to the Fryingpan-Arkansas Project's Environmental Statement <br />which was submitted to the Council of Environmental Quality (CEQ) in 1975. A <br />Draft Supplement was filed with the Environmental Protection Agency, October 6, <br />1983. This FSES addresses the environmental consequences associated with <br />alternative operations of Ruedi Reservoir to meet competing water demands which <br />include industrial, municipal development, recreation, wildlife, fisheries, and <br />hydropower. This FSES also includes the effects of the Round I water sales from <br />Ruedi concluded on May 13, 1982, for 7,850 AF. The reservoir has a firm <br />marketable yield available for both Round I and Round II sales of 51,500 AF (July <br />1 to June 30) based on a hydrologic analysis covering the years 1948 to 1983. <br />Requests for Ruedi water, as of August 1983, exceed 80,000 AF (Table 1.1). <br />The vast majority of requests for Ruedi water was from oil shale interests. <br />The Piceance basin in western Colorado contains large oil shale reserves. <br />Development of the oil shale resource has historically occurred in boom and bust <br />cycles, driven by conditions of the world oil market. While the current world <br />oil market conditions have slowed the development of oil shale projects, energy <br />companies continue to maintain and acquire oil shale resources and to pursue the <br />development of the technology. <br />By the year 2000 to 2010, it is reasonable to assume as a basis for <br />projecting West Slope water demand that economic conditions might foster the <br />development of an oil shale industry. A number of studies have been performed <br />estimating the water needs of the oil shale industry including "An Assessment <br />of Oil Shale Technologies," Office of Technology Assessment 1980; and "The <br />Nation's Water Resources 1975-2000, Upper Colorado River Region," U. S. Water <br />Resources Council. Estimates of oil shale water use vary from 100,000 acre-feet <br />to 400,000 acre-feet of additional water depletions from the Colorado River <br />Basin. The water demand could be met through a number of different sources: <br />marketing of water from Ruedi Reservoir, development of water rights held by the <br />energy companies, purchase of agricultural rights, groundwater, and reservoirs <br />such as the proposed Rock Creek/Muddy Creek reservoir project.
The URL can be used to link to this page
Your browser does not support the video tag.