Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Appendix C <br /> <br />HYDROLOGIC MODELING ANALYSIS <br /> <br />Please note in this appendix that the figures refer to the "Preferred Plan," which is the same <br />as the "Preferred Alternative" mentioned in the text. In addition, the information contained <br />in this appendix has not been updated to include or reflect recently approved depletions for <br />the Long Hollow Reservoir Project or the Jicarilla Apache Nation Navajo River Water <br />Supply Project. <br />