Laserfiche WebLink
<br />1-5 <br />EXECUTIVE SUMMARY <br /> <br />The Executive Summary should not exceed 1 single-spaced page. Arrange <br />to print extra copies of the Executive Summary for distribution to <br />interested parties. It should include: <br /> <br />Current Soecies Status: Status, population level/distribution (if <br />known), and vulnerability to threats. (Let the reader know up front the <br />condition of the species.) <br /> <br />Habitat ReQuirements and limitinQ Factors: list any specialized habitat <br />requirements and major threats to be addressed under Actions Needed. <br /> <br />Recovery Objective: Choose among delisting, downlisting, or protection <br />of existing populations for a specific time period or for the foreseeable <br />future. Be ambitious, but do not set an unobtainable objective (obtained <br />from Part II of the recovery plan). <br /> <br />f <br />f <br /> <br />Recovery Criteria: Indicate the number and arrangement of viable <br />populations, protection and management procedures needed, and what threats <br />should be resolved. Only by being specific in terms of numbers, <br />distribution, amount of habitat, level of protection/enforcement, etc., <br />will the Service and the public be able to assess progress toward the <br />recovery objective. <br /> <br />Actions Needed: Present a numbered list of the major steps needed to <br />satisfy recovery criteria or at least make a significant improvement in <br />species status. <br /> <br />Total Estimated Cost of Recovery: A cost tible may be provided as <br />follows. The bottom right-hand figure should reflect the total estimated <br />cost of recovery (e.g. consultations, permits, law enforcement activities, <br />land management activities, personnel requirements, etc). Costs may be <br />summarized if more applicable. <br /> <br />1990 <br />1991 <br />1992 <br /> <br />Need 1 Need 2 Need 3 Total <br />$ $ $ $ <br />$ $ $ $ <br />$ $ $ $ <br />1- 1- 1- 1- <br />$ $ $ $ <br /> <br />Year <br /> <br />Tota 1 <br /> <br />Date of Recovery: Indicate the anticipated year objectives will be <br />completed. This mayor may not be the last year listed in the above cost <br />table. <br /> <br />(See attached example{s), pages 6 and 7.) <br /> <br />OS/25/90 <br />