Laserfiche WebLink
<br />Chapter 4 <br />Table 3.-Colorado River Basin depletion projections <br /> (Unit: 1,000 af/yr) <br /> 1990 2000 2010 2020 2030 2040 2050 2060+ <br />Arizona (Upper Basin) <br />1965 Framework Study 10 10 10 10 10 10 10 10 <br />1966-90 changes <br />Irrigation 5 3 5 5 5 5 5 5 <br />Municipal and industrial 5 3 6 6 6 6 6 6 <br />Navajo Powerplant 22 22 22 22 22 22 22 22 <br />Gallup-Navajo Indian Water Supply Project 0 7 7 7 7 7 7 7 <br />Total scheduled depletion 42 45 50 50 50 50 50 50 <br />State share of 6.0 maf 50 50 50 50 50 50 50 50 <br />Remaining available 8 5 0 0 0 0 0 0 <br />Percent of State share 16 10 0 0 0 0 0 0 <br />Colorado <br />1990 level of development <br />1965 Framework Study 1,707 1,707 1,707 1,707 1,707 1,707 1,707 1,707 <br />1966-90 changes <br />Agricultural <br />Bostwick Park 4 4 4 4 4 4 4 4 <br />Silt 4 4 4 4 4 4 4 4 <br />Dallas Creek 5 5 5 5 5 5 5 5 <br />Dolores 32 32 32 32 32 32 32 32 <br />Stagecoach/Yamcolo 4 4 4 4 4 4 4 4 <br />Exports 10 10 10 10 10 10 10 10 <br />Miscellaneous 24 24 24 24 24 24 24 24 <br />Municipal/domestic <br />Dallas Creek 2 2 2 2 2 2 2 2 <br />Dolores 5 5 5 5 5 5 5 5 <br />Stagecoach/Yamcolo 1 1 1 1 1 1 1 1 <br />Taylor Draw 2 2 2 2 2 2 2 2 <br />Exports 187 187 187 187 187 187 187 187 <br />Miscellaneous 6 6 6 6 6 6 6 6 <br />Power/industrial <br />Craig/Hayden 13 13 13 13 13 13 13 13 <br />Tri-State (Colorado Ute) 1 1 1 1 1 1 1 1 <br />Industrial <br />Blue Mesa 5 5 5 5 5 5 5 5 <br />Green Mountain 2 2 2 2 2 2 2 2 <br />Ruedi 2 2 2 2 2 2 2 2 <br />Minerals <br />Bluestone 4 4 4 4 4 4 4 4 <br />Other <br />Upper Gunnison Basin 5 5 5 5 5 5 5 5 <br />Miscellaneous 2 2 2 2 2 2 2 2 <br />Total 1990 level 2,027 2,027 2,027 2,027 2,027 2,027 2,027 2,027 <br /> <br />18 <br />