My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7642
CWCB
>
UCREFRP
>
Public
>
7642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/20/2009 2:46:24 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7642
Author
Smith, G. R.
Title
A Catalog of Water and Energy Development Projects in the Upper Colorado River Basin.
USFW Year
1982.
USFW - Doc Type
Denver, Colorado.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />TAR SANDS <br /> <br />Map Code - Green 2 <br /> <br />Project Name: Great National Tar Sand Project <br /> <br />Company: Great National Corporation <br />2320 South Tower LB <br />174 Plaza of the Americas <br />Dallas, Texas 75261 <br /> <br />COlmty: Carbon Cmmty, Utah <br /> <br />Location: Sunnyside Tar Sand Deposit <br />T. 13 S., R. 13 E. <br /> <br />Production Capacity: Initial - 10,000 BPD <br />Intermediate - 30,000 BPD <br />Full capacity - 100,000 BPD <br /> <br />. <br /> <br />Technology: Flotation - fluid bed with open pit mining <br /> <br />. .. <br /> <br />Resource Base: One billion tons strippable outcrop <br />Company estimate - 8 percent by weight bitumen, 80 percent <br />in ground reserves recoverable. <br /> <br />Resource Requirement: Water - 36,000 AFY for 30,000 BPD configuration <br /> <br />Leasing Information: 1,500 State leases <br /> <br />Current Status: $380,000 budgeted for comprehensive review of <br />permit regulations <br /> <br />Comments: Great National has expended $750,000 to date on this project. <br />Recently they were selected by DOE for an award to help fund <br />feasibility of the project. This award, however, may be <br />rescinded. <br /> <br />For the total project cost estimated at $240,000,000, Great <br />National has asked for a 75 percent loan guarantee from DOE. <br /> <br />Product to be piped to Chevron Salt Lake Refinery. <br /> <br />Information Source: 1 <br /> <br />. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.