Laserfiche WebLink
1 <br />1 <br />,I] <br /> <br />1 <br />1 <br /> <br />1 <br /> <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br /> <br /> <br />the characteristics of the invertebrate community and water quality within the floodplains and in <br />the main channel. Four monthly trips followed flood recession and the concurrent disconnection <br />of the floodplain from the main channel. These were to monitor invertebrate communities in any <br />floodplain areas that retained water and the main channel. <br />During 1996, sampling within the main channel of the Green River was conducted at <br />three locations adjacent to each of the six sites. These locations are referred to as above, mid, <br />and below with corresponding locations in the channel described in relation to the specific <br />floodplain site. For the 1997 and 1998 seasons, river sampling was reduced to three reaches with <br />reach one located adjacent to the Bonanza Bridge site, reach two adjacent to the above Brennan <br />site, and reach three adjacent to the Old Charlie Manipulated site. At each location water <br />chemistry, benthos, and invertebrate drift samples were collected in replicate. Temperature and <br />dissolved oxygen levels were also recorded (Table 2.1). Areas of connection between the main <br />channel and the floodplain referred to as inflow and outflow were also sampled. At these sites, <br />drift, water velocity, temperature, and dissolve oxygen were sampled. <br />Table 4.1. Monitoring and sample design. <br />Site Type Sample Collection Sample Schedule (Week) <br />Bonanza Depression Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br />Bridge Zooplankton, Productivity 7,8,9,10 monthly post-flood <br />Baser/Chew Terrace Water Quality, Benthos, Drift, I pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton 7,8,9,10 monthly post-flood <br />Horseshoe Bend Terrace Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton 7,8,9, 10 monthly post-flood <br />The Stirrup Depression Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton, Productivity 7,8,9, 10 monthly post-flood <br />Baesar Bend Depression Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton 7,8,9,10 monthly post-flood <br />Above Depression Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br />Brennan Zooplankton 7,8,9, 10 monthly post-flood <br />Johnson 4 Depression Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton, Productivity 7,8,9, 10 monthly post-flood <br />Leota 7 Depression Water Quality, Benthos, Drift, I pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton, Productivity 7,8,9, 10 monthly post-flood <br />Leota 10 Terrace Water Quality, Benthos, Drift, 1 pre-flood-, 2,3,4,5,6 during flood; <br /> Zooplankton 7,8,9, 10 monthly post-flood <br />below Sheppard Terrace Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br /> Zooplankton 7,8,9,10 monthly post-flood <br />Old Charlie Terrace Water Quality, Benthos, Drift, 1 pre-flood; 2,3,4,5,6 during flood; <br />Diked Zooplankton 7,8,9,10 monthly post-flood <br /> <br />Old Charlie <br />Terrace <br />Water Quality, Benthos, Drift, 77 <br />1 pre-flood; 2,3,4,5,6 durin load; <br />Wash Zooplankton 7,8,9,10 monthly post-flct <br />1 46 <br /> <br /> <br />