Laserfiche WebLink
Table 9A.-Turbidity (NTU) for all stations during phases 1 and 2. <br /> Davis Park Parker Headgate Palo Verde Cibola Imperial Laguna Yuma <br /> Dam Moabi Rock Diversion <br />DATE Dam Dam <br />PHASE 1 032486 1.1 ND" ND 3.0 ND ND 9.4 8.0 ND <br />042186 1.7 1.5 2.0 2.5 3.2 ND 8.4 10.0 ND <br />060186 1.0 1.4 3.0 4.3 6.6 8.0 9.8 9.8 ND <br />082586 2.4 2.4 4.4 3.6 4.6 19.0 11.0 10.0 ND <br />102086 1.1 2.0 4.5 3.6 3.8 5.7 7.6 ND 9.9 <br />120286 1.4 1.6 3.7 3.3 4.5 5.5 6.8 ND 39.0 <br />010587 3.6 1.4 3.5 3.5 5.3 5.6 7.7 ND 16.0 <br />020987 8.2 1.3 2.7 3.6 3.4 5.4 8.3 ND 13.8 <br />031687 1.2 1.2 2.4 3.3 3.5 5.5 8.4 ND 8.0 <br />042087 1.1 1.8 4.8 4.6 4.1 7.9 8.6 ND 7.2 <br />051887 1.0 2.9 2.8 11.2 3.9 6.2 7.5 ND 9.6 <br />w 062287 1.9 2.5 2.8 3.5 3.4 4.1 7.8 ND 9.1 <br />X 2.2+ 1.8 3.3 4.3 4.2 7.2 8.3 ND 13.2 <br /> Davis Park Havasu Parker Palo Verde Cibola Palo Verde DR3 Imperial All Laguna Yuma <br /> Dam Moabi Delta Dam Diversion Irrigation American <br />DATE Dam Drain Canal <br />PHASE 2 <br />101987 1.8 2.2 3.4 4.9 2.9 4.2 ND ND ND ND ND 12 <br />3 <br />110187 ND ND ND ND ND ND 23.0 9.5 13.0 13.0 10 <br />0 . <br />ND <br />012588 1.8 2.7 3.6 1.8 4.3 5.3 21.0 9.7 7.5 9.4 . <br />8 <br />8 7 <br />3 <br />031488 1.8 3.8 5.6 4.9 4.3 9.1 24.0 8.4 10.7 11.6 . <br />37 <br />0 . <br />12 <br />0 <br />050288 2.2 2.4 3.3 4.0 5.9 7.2 34.3 9.0 12.7 10.3 . <br />9.3 . <br />8 <br />8 <br />062788 1.9 2.4 3.3 3.0 3.7 4.7 20.0 6.6 8.4 7.2 7.5 . <br />8 <br />7 <br />082288 2.5 2.2 4.5 6.0 3.7 25.0 25.5 38.3 74.0 22.0 31.3 . <br />11.8 <br />X 2.0` 2.6 4.0 4.1 4.1 9.3 24.6 13.6 21.1 12.3 17.3 10.2 <br />* Mean was calculated from October 1986 through June 1987 for Phase 1. <br />Mean was calculated from January through August 1988 for Phase 2. <br />ND - no data were collected.