Laserfiche WebLink
Table 1A.-Field survey dates at each station on the lower Colorado River for phases 1 and 2. <br />Stations <br />W <br />U7 <br />Survey date Davis Park Havasu Parker Headgate Palo Verde Cibola Palo Verde DR3 Imperial All Laguna Yuma <br />Dam Moabi Delta Dam Rock Dam Diversion Irrigation American <br />Dam Drain -Canal <br />Phase 1 <br />03-26-86 <br />04-22-86 x x x x x <br />06-09-86 x x x x x X <br />08-25-86 X x x x x x <br />10-20-86 X x x x x x <br />12-01-86 x x x x x x <br />01-05-87 x x x x x x <br />02-09-87 x x x x x x <br />03-16-87 X x x x x x <br />04-20-81 x x x x x x <br />05-18-87 x x x x x x <br />06-22-87 x x x x x x <br />Phase 2 <br />10-19-87 x x x x x x <br />11-16-87 x x x <br />01-25-88 x x x x x x x <br />03-14-88 x x x x x x x x <br />05-02-88 x x x x x x x x <br />06-27-88 x x x x x x x x <br />08-22-88 x x x x x x x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x <br />x x x <br />x x x x <br />x x x x <br />x x x x <br />x x x x <br />x x x x