Laserfiche WebLink
<br />PART VI <br /> <br />e <br /> <br />Type of <br />usell <br /> <br />Table B <br />CRSS projected salt pickup <br /> <br />1983 <br /> <br />FUTURE DEVELOPMENT <br /> <br />TDS pickup.;!.1 <br />(1 ,000 tons/year) <br />1990 2000 2010 <br />443.5 443.5 443.5 <br />-1.1 -3.8 -6.8 <br />442.4 439.7 436.7 <br />2,410.3 2,410.3 2,410.3 <br />0 5.0 5.0 <br />6.5 5.9 10.0 <br />1.4 1.4 1.4 <br />-2.9 -4.2 -6.1 <br />0 -.3 -.3 <br />-2.5 -2.5 -2.5 <br />-2.7 -2.7 -2.7 <br />2,410.1 2,412.9 2,415.1 <br />2,353.8 2,353.8 2,353.8 <br />-15.5 -21. 6 -21. 6 <br />1.5 6.2 6.2 <br />33.2 33.2 33.2 <br />0 14.5 14.5 <br />14.1 14.1 20.3 <br />10.3 43.4 43.4 <br />2,397.4 2,437.4 2,449.8 <br />96.5 96.5 96.5 <br />0 1.0 1.0 <br />II. 5 11.5 11.5 <br />239.0 306.8 306.8 <br />347.0 428.6 428.6 <br /> <br />Wyoming <br />Base condition <br />Transbasin diversions <br />Total <br />Colorado <br />Base condition <br />Animas-La Plata Project <br />Dallas Creek Project <br />Dolores Project <br />Denver Expansion <br />Colorado Springs Expansion <br />Homestake Expansion <br />Windy Gap <br />Total <br /> <br />e <br /> <br />Utah <br />Base condition <br />Central Utah Project <br />Bonneville Unit <br />Upalco Unit <br />Jensen Unit <br />Uintah Unit <br />Utah Department of Water Resources <br />projects <br />Deferred Indian lands <br />Total <br />New Mexico <br />Base condition <br />Animas-La Plata Project <br />Hogback Expansion <br />Navajo Indian Irrigation Project <br />Total <br /> <br />Ex <br /> <br />Ir <br />Ir <br />Ir <br />Ex <br />Ex <br />'x <br />Ex <br /> <br />Ir, Ex <br />Ir <br />Ir <br />Ir <br />Ir <br />Ir <br />Ir <br />Ir <br />Ir <br /> <br />443.5 <br />-1.1 <br />.442.4 <br /> <br />2,410.3 <br />o <br />o <br />o <br />-2.4 <br />o <br />-1.5 <br />o <br />2,406.4 <br /> <br />2,353.8 <br /> <br />-4.2 <br />o <br />8.6 <br />o <br /> <br />9.7 <br />2.1 <br />2,370.0 <br /> <br />96.5 <br />o <br />5.7 <br />145.9 <br />248.1 <br /> <br />Arizona <br />Base condition 12.1 12.1 12.1 12.1 <br />1/ Lower Colorado River Basin eRSS model does not consider each project separately. TDS pickup is not <br />broken out by project; it is input on a reach-by-reach (cumulative) basis as part of the base salt load pickup. <br />l/ Ir = Irrigation assumes an annual salt pickup of 2 tons per acre of newly irrigated lands and none for <br />lands receiving supplemental irrigation. Ex = Exports remove salt at ~ rate approximating their salinity. <br /> <br />e <br /> <br />60 <br />