Laserfiche WebLink
<br />PART VI <br /> <br />FUTURE DEVELOPMENT <br /> <br />e <br /> <br />g. Gallup-Navajo Indian Water Supply Project <br /> <br />See <br />Mexico on page 39. <br />community of White <br /> <br />discussion under Navajo Reservoir Contracts, New <br />The project will supply 1,180 acre-feet to the Utah <br />Mesa Village. <br /> <br />h. Ute Indian Lands <br /> <br />Under the Deferral Agreement of September 20, 1965, the <br />Ute Indians agreed to defer development of 15,242 acres of land, but not <br />beyond January I, 2005. On August 13, 1975, the Ute Indian Tribe passed <br />a resolution requesting that development of Indian facilities proceed <br />concurrently with development of non-Indian facilities. The Secretary <br />agreed on August 21, 1975. Leland Bench was recognized as a means of <br />developing 15,242 acres of land. This plan, as with the Uintah Unit, is <br />not being strongly supported by the Ute Indian Tribe and has been in- <br />cluded for further study with the Interim Agreement. For purposes of <br />this report, depletions are based on the previous Leland Bench Develop- <br />ment Plan. No construction schedule is available, and it does not <br />appear that significant uses of water will be made by 1990. Total ulti- <br />mate depletions are estimated to be about 45,000 acre-feet. <br /> <br />e <br /> <br />The Ute Indian Compact (yet to be ratified) recognizes <br />Indian rights to irrigate 12,845 acres of Class 6 and 7 lands in the <br />White River drainage and 4,068 acres of Class 7 lands along the Green <br />River, which would result in depletions of approximately 30,000 and <br />9,000 acre-feet, respectively. The State of Utah estimates that the <br />latter will materialize by about 2000, with depletions in 1990 at about <br />a level of 20,000 acre-feet. <br /> <br />It is estimated <br />near the White River have come <br />Framework Study determinations. <br /> <br />that about 1,500 acres of Indian lands <br />under irrigation since the Comprehensive <br />Depletion is about 4,000 acre-feet. <br /> <br />i. Division of Water Resources Projects <br /> <br />In August 1983 the Division of Water Resources (DWR) of <br />the State of Utah made a determination which showed that 11,400 acre- <br />feet of water were being depleted in 1983 by DWR-sponsored projects. <br />The division estimates that depletions will increase to 24,000 acre- <br />feet by 2010. <br /> <br />j. Emery County Powerplants <br /> <br />e <br /> <br />Both units of the Huntington Powerplant of Utah Power & <br />Light Company were in service in 1983. Water use records indicate that <br />the powerplant uses up to 12,000 acre-feet a year. Two units of the <br />Hunter Powerplant of Utah Power & Light Company, located near Castle- <br />dale, were on line in 1983. Water use records for this plant also indi- <br />cate a maximum annual use of about 12,000 acre-feet. One additional <br />unit began operation in March 1983. The fourth unit is projected to be <br /> <br />47 <br />