Laserfiche WebLink
LIST OF APPENDICES <br />Appendix <br />Page <br />H. Table H.11. Catch effort (total number of fish divided <br />by total effort [hour] for juvenile (JUV) and adult (ADU) <br />fish collected by electrofishing in Reach 4 of the Gunnison <br />River, Colorado during April/May, June/July, and September/ <br />October 1993 . . . . . . . . . . . . . . . . . . . . . . . . . . H-11 <br />H. Table H.12. Catch effort (total number of fish divided <br />by total effort [hour] for juvenile (JUV) and adult (ADU) <br />fish collected by electrofishing in Reach 5 of the Gunnison <br />River, Colorado during April/May, June/July, and September/ <br />October 1993 . . . . . . . . . . . . . . . . . . . . . . . . . . H-12 <br />H. Table H.13. Catch effort (total number of fish divided <br />by total effort [hour] for juvenile (JUV) and adult (ADU) <br />fish collected by electrofishing in Reach 6 of the Gunnison <br />River, Colorado during April/May, June/July, and September/ <br />October 1993 . . . . . . . . . . . . . . . . . . . . . . . . . . H-13 <br />H. Table H.14. Catch effort (total number of fish divided <br />by total effort [hour] for juvenile (JUV) and adult (ADU) <br />fish collected by electrofishing in Reach 7 of the Gunnison <br />River, Colorado during April/May, June/July, and September/ <br />October 1993 . . . . . . . . . . . . . . . . . . . . . . . . . . H-14 <br />1. Table I.I. Total length (TL [mm]) and weight (Wt [g]) <br />statistics for bluehead sucker collected by electrofishing <br />from seven river reaches of the Gunnison River, Colorado, <br />April, June, July, and October 1992 . . . . . . . . . . . . . . I-1 <br />1. Table 1.2. Total length (TL [mm]) and weight (Wt [g]) <br />statistics for flannelmouth sucker collected by <br />electrofishing from seven river reaches of the Gunnison <br />River, Colorado, April, June, July, and October 1992 . . . . . . I-2 <br />I. Table 1.3. Total length (TL [mm]) and weight (Wt [g]) <br />statistics for roundtail chub collected by electrofishing <br />from seven river reaches of the Gunnison River, Colorado, <br />April, June, July, and October 1992 . . . . . . . . . . . . . . I-3 <br />I. Table 1.4. Total length (TL [mm]) and weight (Wt [g]) <br />statistics for bluehead sucker collected, by electrofishing <br />from seven river reaches of the Gunnison River, Colorado, <br />April/May, June/July, and September/October 1993 . . . . . . . . I-4. <br />xi