Laserfiche WebLink
<br />TIMETABLE <br />Below is a suggested timetable for the initial phases of major activities <br />associated with propagation and experimental stocking of hatchery- and pond- <br />cultured razorback sucker in the upper Colorado River drainage. <br /> <br /> Time Frame calendar ear <br /> Ma.ior Activities Start Completion <br /> Write Draft Experimental <br /> Stocking Plan 1989 1992 <br /> Develop and Maintain Captive <br /> Broodstock Populations 1989 Continuing <br /> --Capture Wild Adult Fish 1989 1992 1993 <br /> --Develop Breeding Strategies <br /> and Protocols 1991 <br /> --Test and Recommend Suitable <br /> Means to Individually Identify/Mark <br /> Wild Broodstock and Offspring 1989 1991 <br /> --Spawn Wild Broodstock using <br /> Breeding Strategy to Produce F1 <br /> Backup Broodstock 1991 Continuing <br /> --Spawn Wild Broodstock using <br /> Breeding Strategy to Produce F1 <br /> Fish for Stocking' 1993 <br /> --Maintain and Rear F Family <br />L <br />t <br />S <br />l <br />L <br /> o <br />s <br />eparate <br />y in <br />rs/Tanks 1992 1993 <br /> --Individually Mark F1 Fish 1993 or 1994 <br /> Habitat Development/Enhancement 1992 Continuing <br /> --Acquisition, Rehabilitation, and <br /> Construction of Grow-out Ponds for <br /> Rearing F1 Fish 1992 Continuing <br /> Transport Marked Fish to <br /> Grow-out Ponds 1993 1994 Continuing <br /> Survey Genetic Resources 1990 1993 <br /> --Develop Non-lethal Tissue Sampling <br /> Methods 1990 1991 <br /> --Develop Field Sampling Protocol 1991 1991 <br /> --Sample Wild and Domestic Populations 1991 1992 1993 <br /> --Analyze Tissue Samples 1992 1993 <br /> --Final Report w/ Results; <br />45 <br />10