Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br /> <br />Photo No, CN-1745-417-8NA - Contractor excavating unsuitable foundation material at forebay structure and 12-inch cobble rock <br />and gravel fill being placed to stabilize foundation. Notice steel shoring that was installed to help stabilize the cofferdam (left side of <br />picture). <br />